会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • METHODS AND APPARATUS FOR CONDUCTING A SEISMIC SURVEY
    • 用于进行地震勘测的方法和装置
    • WO2010149589A3
    • 2011-03-03
    • PCT/EP2010058629
    • 2010-06-18
    • STATOIL ASAMELDAHL PAULSTENSENG TROND
    • MELDAHL PAULSTENSENG TROND
    • G01V1/38
    • G01V1/3808
    • A method of conducting a marine seismic survey of a survey area which comprises deploying a plurality of receiver cables (11) to define an active receiver area (12) the cables (11) extending in a longitudinal direction and towing a seismic source (14) behind a source vessel (13) to track across the active receiver area (12) in the longitudinal direction along a first line, turning the source vessel (13) and its source (14) around and then towing the source (14) to track back across the receiver area (12) in the reverse longitudinal direction along a second line, generally parallel to the first line. The second line is spaced from the first line in a transverse direction which is generally perpendicular to the longitudinal direction. The tracking, turning and tracking back steps are then repeated whereby the source vessel (13) and its source track across the active receiver area (12) along successively advanced lines. The source (14) is continuously fired at particular positions and/or time intervals while it is tracking the receiver area (12), and the seismic responses to the firing are continuously detected using the deployed receiver cables (11). The receivers (11) are picked up while the source (13) is being fired and redeployed.
    • 一种进行测量区域的海洋地震测量的方法,包括部署多个接收器电缆(11)以限定沿纵向方向延伸的电缆(11)的有源接收器区域(12)并且牵引地震源(14) 在源容器(13)之后沿着第一线在纵向方向上横过主动接收器区域(12)跟踪,将源容器(13)及其源(14)转动,然后将源(14)牵引到轨道 沿着与第一条线平行的第二条线沿相反纵向的方向跨越接收器区域(12)。 第二线在大致垂直于纵向方向的横向上与第一线隔开。 随后重复跟踪,转向和跟踪步骤,从而使源容器(13)及其源轨迹沿着相继的先进线横跨主动接收器区域(12)。 在跟踪接收器区域(12)的同时,在特定位置和/或时间间隔连续地对源(14)进行点火,并使用部署的接收器电缆(11)连续地检测对点火的地震响应。 接收器(11)在源(13)被激发和重新部署时被拾取。