会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • TOOL FOR INSTALLATION OF BUILDING ELEMENTS
    • 工具安装建筑元件
    • WO2013156879A3
    • 2014-07-17
    • PCT/IB2013051983
    • 2013-03-13
    • SPALLINA GIACOMOVALENZA DAVIDE
    • SPALLINA GIACOMOVALENZA DAVIDE
    • H02G3/00
    • H02G3/00A63B21/0455H02G2200/30
    • A tool for the installation of building elements into a compartment of a wall or planar support comprises a frame (2, 102) with a central passage (3, 103) adapted to be placed in correspondence of the compartment (V) for introducing thereinto the building element (E), which frame (2, 102) comprises two longitudinal bars (4, 5; 104, 105) having respective retaining surfaces (6, 7; 106, 107) reciprocally facing and transversally spaced with a first transverse distance (di) to define the passage (3, 103) and first means (8, 108) for adjusting the first transverse distance (di) adapted to allow the facing retaining surfaces (6, 7; 106, 107) to removably engage opposite faces (F, F') of the building element (E) and to temporarily support it during its installation. The first adjustment means (8, 108) comprise a pair of connecting elements (9, 10; 109, 110) substantially elongated along respective first transverse directions (Y, Y') and longitudinally spaced with each other to delimit laterally the passage (3, 103). Each connecting element (9, 10; 109, 110) is adapted to connect respective opposite longitudinal ends (4', 5'; 4", 5"; 104', 105'; 104", 105") of the bars (4, 5; 104, 105) and has an intermediate section (11, 12; 111, 112) interposed between the bars (4, 5; 104, 105) with an adjustable transverse length (y, y') to adapt the first transverse distance (di) to the maximum transverse dimension (D) of the building element (E).
    • 用于将建筑元件安装到壁或平面支撑件的隔室中的工具包括具有中心通道(3,103)的框架(2,102),该中心通道适于相应于隔室(V)放置以便将其引入到 所述框架(2,102)包括两个纵向杆(4,5; 104,105),所述纵向杆具有相应的保持表面(6,7; 106,107),所述两个纵向杆彼此面对并横向间隔开第一横向距离 以限定通道(3,103)和第一装置(8,108),用于调节第一横向距离(di),该第一横向距离(di)适于允许相对的保持表面(6,7; 106,107)可拆卸地接合相对面 F,F'),并在其安装期间临时支撑它。 第一调节装置(8,108)包括一对连接元件(9,10; 109,110),该对连接元件沿相应的第一横向方向(Y,Y')大致伸长并且彼此纵向间隔开以限制横向通道(3) ,103)。 每个连接元件(9,10; 109,110)适于连接杆(4)的相应的相对纵向端(4',5'; 4“,5”; 104',105'; 104“,105”) ,5; 104,105),并且具有介于具有可调节横向长度(y,y')的所述杆(4,5; 104,105)之间的中间部分(11,12; 111,112),以使所述第一横向 距离(di)到建筑构件(E)的最大横向尺寸(D)。