会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD AND DEVICE FOR DETERMINING MODEL PARAMETERS FOR CONTROLLING A STEAM POWER PLANT BLOCK, CONTROL UNIT FOR A STEAM GENERATOR AND COMPUTER PROGRAM PRODUCT
    • 方法和设备,用来确定模型参数来控制蒸汽发电装置积木控制装置的蒸汽发生器及计算机程序产品
    • WO2012000929A2
    • 2012-01-05
    • PCT/EP2011060696
    • 2011-06-27
    • SIEMENS AGWENDELBERGER KLAUS
    • WENDELBERGER KLAUS
    • G05B13/04F01K3/22F22B35/18
    • F22B35/18F01K3/22G05B17/02
    • The invention relates to a method and to a corresponding device for determining at least one model parameter of a control engineering model of a steam generator, wherein a control engineering model structure having the at least one characteristic model parameter is predetermined for the steam generator. Measurement signals of the steam generation process are recorded online. According to the invention, the at least one model parameter is estimated online. For this purpose the same input signal is applied to both the real process and the model of the steam generator. Next, an estimability analysis is carried out, wherein at least one output signal of the respective process and/or model, or at least one input signal, are processed by a comparative evaluation on the basis of a gradient analysis. Estimation ranges within which a valid parameter estimation is possible are defined in a further step on the basis of the gradient analysis. If the estimability is positively assessed, the current estimated value of the at least one model parameter is improved and furthermore the model is adapted by means of the estimated values in an iterative process. The invention further relates to a control unit for a steam generator and to a computer program product.
    • 本发明涉及一种方法,以及用于确定蒸汽发生器,其中所述至少一个特征的模型参数被用于蒸汽发生器,一控制工程模型结构给定的一个闭环控制模型中的至少一个模型参数的相应装置。 蒸汽产生过程的测量信号线上取。 根据本发明,所述至少一个模型参数联机估计。 到两个实际过程和蒸汽发生器的模型被切换相同的输入信号。 随后,Schätzbarkeitsanalyse执行,其中,在每个处理和/或模型或至少一个输入信号的至少一个输出信号由基于梯度分析的比较分析处理。 基于所估计的梯度分析范围在进一步的步骤在其内有效的参数估计是可能定义。 如果estimability肯定判定时,电流估计值的所述至少一个模型参数的提高,进一步模型由在迭代过程中的估计值的装置,其适于。 本发明还涉及一种用于蒸汽发生器和计算机程序产品的控制装置。
    • 2. 发明申请
    • METHOD FOR THE INSTALLATION CONTROL IN A POWER PLANT
    • 方法调节控制IN A电厂
    • WO2010003735A3
    • 2012-01-26
    • PCT/EP2009056529
    • 2009-05-28
    • SIEMENS AGCHRISTIDIS ANDREASWENDELBERGER KLAUS
    • CHRISTIDIS ANDREASWENDELBERGER KLAUS
    • F01K13/02
    • F01K13/02
    • The invention relates to a method for the installation control in a power plant, wherein a functional value of a target function (7) based on a physical model is generated for a plurality of sets of variables (15), from respectively a set of environment variables on the one hand and the respective set of variables (15) on the other hand, said functional value being allocated to the respective sets. According to the invention, the set of variables (15) is selected to be transmitted to a control device (21) of the power plant, whose allocated functional value complies with a predefined optimization criterion. The inventive method shall allow an improved operation of the power plant with respect to a provided optimization criterion, such as for example an improved efficiency or a reduction of emission with little technical complexity for control purposes. In addition to a starting set and a set determined on the basis of the starting set and the functional value allocated thereto by means of a gradient method, the number of sets of variables (15) further comprises a set selected by a random generator.
    • 在发电厂系统控制的方法,其中,用于多组控制值的(15)各由一方面的一组环境值和相应的一组,从另一方面操纵变量(15)中的,相关联的基于物理模型的目标函数的各组函数值 (7)被产生,其特征在于,所述一组操纵变量(15)被选择用于转发到电源设备的控制装置(21),其相关联的函数值满足预定的优化标准,以尽可能少的税的技术努力提高了电厂的操作相对于一给定的优化准则 这样的。 由于能够提高效率或减少废气排放。 这些也包括在除了一个起始块和由起始块和通过设置一组随机的选择的装置的梯度的手段及其相关联的函数值检测到起始组控制值(15)的数量。