    • A METHOD FOR CONSTRUCTING CAST-IN-PLACE WALLS WITH BINDER
    • 一种用于构造具有粘结剂的嵌入式墙壁的方法
    • WO2016010488A1
    • 2016-01-21
    • PCT/TH2015/000044
    • 2015-07-16
    • SIAM MORTAR CO., LTD.
    • SURIYAPANANONT, RawatPINTAPATE, Aumjai
    • E04G11/06E04G9/10E04B2/84
    • E04G11/18E04B2002/8682E04G11/06E04G21/04E04G21/0472
    • The present invention relates to a cast-in-place wall construction method comprising the steps of: determining the wall line; forming kicker along the determined wall line; providing at least one of heat protection material or sound protection material or water protection material inside the formwork; installing the formwork along the wall line such that there is a gap between the two panels of the formwork or a gap between one panel of the formwork and a rigid body located on the opposite side of said panel; filling the binder into the gap of the formwork; leaving said binder to harden and to cure within the formwork; and removing the formwork. According to the invention, the filling of binder into the gap of the formwork is carried out by positioning an end of at least one binder filling tube above the slurry surface level at which the binder is to be filled, with at least one binder filling tube being moved vertically or horizontally or with at least one binder filling tube being moved both vertically and horizontally in a relative manner.
    • 本发明涉及一种现浇墙施工方法,包括以下步骤:确定墙线; 沿着确定的墙线形成踢球者; 在模板内提供至少一种防热材料或防护材料或防水材料; 沿着墙线安装模板,使得模板的两个面板之间存在间隙或模板的一个面板之间的间隙和位于所述面板的相对侧上的刚体; 将粘合剂填充到模板的间隙中; 使所述粘合剂在模板内硬化和固化; 并移除模板。 根据本发明,通过将至少一个粘合剂填充管的端部定位在待填充粘合剂的浆料表面水平面上方的至少一个粘合剂填充管上,将粘合剂填充到模板的间隙中 垂直或水平移动或至少一个粘合剂填充管以相对的方式垂直和水平地移动。
    • 3. 发明申请
    • A METHOD FOR CONSTRUCTING CAST-IN-PLACE WALLS
    • 一种建筑工地墙的方法
    • WO2016010487A1
    • 2016-01-21
    • PCT/TH2015/000043
    • 2015-07-16
    • SIAM MORTAR CO., LTD.
    • SURIYAPANANONT, RawatPINTAPATE, Aumjai
    • E04G11/06E04G9/10E04B2/84
    • E04G11/06E04B2002/8682E04G11/18E04G21/04E04G21/0472
    • The present invention relates to a cast-in-place wall construction method comprising the steps of: determining the wall line; forming kicker along the determined wall line; providing at least one of heat protection material or sound protection material or water protection material inside the formwork; installing the formwork along the wall line such that there is a gap between the two panels of the formwork or a gap between one panel of the formwork and a rigid body located on the opposite side of said panel; filling the mortar into the gap of the formwork; leaving said mortar to harden and to cure within the formwork; and removing the formwork. According to the invention, the filling of mortar into the gap of the formwork is carried out by positioning an end of at least one mortar filling tube above the slurry surface level at which the mortar is to be filled, with at least one mortar filling tube being moved vertically or horizontally or with at least one mortar filling tube being moved both vertically and horizontally in a relative manner.
    • 本发明涉及一种现浇墙施工方法,包括以下步骤:确定墙线; 沿着确定的墙线形成踢球者; 在模板内提供至少一种热保护材料或防声材料或防水材料; 沿着墙线安装模板,使得模板的两个面板之间存在间隙或模板的一个面板之间的间隙和位于所述面板的相对侧上的刚体; 将砂浆填充到模板的间隙中; 留下砂浆在模板内硬化和固化; 并移除模板。 根据本发明,通过至少一个砂浆填充管将至少一个砂浆填充管的端部定位在浆料表面水平面上方,将砂浆填充到模板的间隙中 垂直或水平移动或至少一个砂浆填充管以相对的方式垂直和水平地移动。