会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • PIPE-LAYING VESSEL AND METHOD OF LAYING A PIPELINE
    • 管道管和铺设管道的方法
    • WO2009153354A2
    • 2009-12-23
    • PCT/EP2009/057700
    • 2009-06-19
    • SAIPEM SPALEGAIGNOUX, Herve Jean FrancoisBAYLOT, Michel PierreHUOT, EmmanuelARDAVANIS, Kimon Tullio
    • LEGAIGNOUX, Herve Jean FrancoisBAYLOT, Michel PierreHUOT, EmmanuelARDAVANIS, Kimon Tullio
    • F16L1/19
    • F16L1/19F16L1/207
    • A pipe-laying vessel (1) is provided, including a tower (2) extending upwardly from the vessel, a pipe loading arm (9) for raising a length of pipe from the deck to a position aligned with the tower, a travelling clamp assembly (30) mounted for movement along the tower. The pipe-laying vessel may include a fixed clamp assembly (60) located in the region of a lower portion of the tower, wherein the travelling clamp assembly and/or the fixed clamp assembly includes both a friction clamp (34, 63) and a collar clamp (62), each of the friction clamp and the collar clamp being movable between an operative position, in which it is adjustable between a clamping and a released position, and an inoperative position. Alternatively or additionally the travelling clamp assembly (30) includes both a line-up clamp (33) and a pipeline tension bearing clamp (34). Alternatively or additionally there may be provided three or more line-up clamps (33, 35, 36) spaced along the tower for receiving the length of pipe from the loading arm.
    • 提供了一种放管容器(1),包括从容器向上延伸的塔架(2),用于将一段长度的管道从甲板升高到与塔架对准的位置的管道装载臂(9) 组件(30)安装成沿塔架移动。 铺管船可以包括位于塔的下部区域中的固定夹具组件(60),其中移动夹具组件和/或固定夹具组件包括摩擦夹(34,63)和 每个摩擦夹具和套环夹具可在操作位置之间移动,操作位置可在夹紧位置和释放位置之间进行调节,并且在非工作位置。 或者或另外,行进夹具组件(30)包括排线夹具(33)和管道张紧轴承夹具(34)。 或者或另外地,可以设置有三个或更多个沿着塔架隔开的排队夹具(33,35,36),用于从装载臂接收管道的长度。
    • 2. 发明申请
    • PIPE-LAYING VESSEL AND METHOD OF LAYING A PIPELINE
    • 管道管和铺设管道的方法
    • WO2009153352A2
    • 2009-12-23
    • PCT/EP2009/057698
    • 2009-06-19
    • SAIPEM SPALEGAIGNOUX, Herve Jean FrancoisBAYLOT, Michel PierreHUOT, EmmanuelARDAVANIS, Kimon Tullio
    • LEGAIGNOUX, Herve Jean FrancoisBAYLOT, Michel PierreHUOT, EmmanuelARDAVANIS, Kimon Tullio
    • F16L1/19
    • F16L1/19F16L1/207
    • A pipe-laying vessel (1) is provided, including a tower (2) extending upwardly from the vessel, a pipe loading arm (9) for raising a length of pipe from the deck to a position aligned with the tower. The pipe-laying vessel may also include a support assembly (110) for supporting a bulky item to be accommodated along the pipeline, the support assembly including a frame (111) pivotable between a first load receiving position and a second tilted position in which it extends approximately parallel to the tower, and drive means for pivoting the tiltable frame between its first and second positions. The pipe-laying vessel may alternatively or additionally include a welding assembly station cabin (100) in the region of a lower portion of the tower, a movable support assembly (110) for supporting a bulky item to be accommodated along the pipeline, the movable support assembly being disposed on top of the cabin.
    • 提供了一种放管容器(1),其包括从容器向上延伸的塔架(2),用于将一段管道从甲板升高到与塔架对准的位置的管道装载臂(9)。 铺管船也可以包括支撑组件(110),支撑组件(110)用于支撑沿着管道容纳的大件物品,支撑组件包括可在第一承载位置和第二倾斜位置之间枢转的框架(111) 大致平行于塔架延伸,以及用于使可倾斜框架在其第一和第二位置之间枢转的驱动装置。 铺管船可以替代地或另外包括在塔的下部区域中的焊接组装站舱(100),用于支撑沿管道容纳的大件物品的可移动支撑组件(110) 支撑组件设置在机舱的顶部。