会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • PRESSURE SWITCH FOR SELECTIVE FIRING OF PERFORATING GUNS
    • 用于选择性执行机构的压力开关
    • WO2016123312A1
    • 2016-08-04
    • PCT/US2016/015320
    • 2016-01-28
    • OWEN OIL TOOLS LP
    • LAGRANGE, Timothy, E.DAY, Cory, D.PATTON, GeorgePRATT, Dan, W.
    • E21B43/1185
    • E21B43/1185E21B43/11852
    • A switch (100) includes a casing (110) having a bore (112), a piston assembly (130) having a first end (134) and an exposed end (140), a plurality of flanges (138) formed at the first end; an insulating sleeve (136) enclosing the first end, a contact assembly (150) disposed in the casing bore; a pin (170) disposed in the bore; a predetermined quantity of lubricant (210) deposited in the bore; and a spring (190) urging the pin into engagement with the piston assembly. The insulating sleeve and the plurality of flanges are at least partially disposed in the casing bore. The pin has: (i) a first position wherein the pin electrically contacts the piston assembly and is electrically isolated from the contact assembly; and (ii) a second position wherein the pin is electrically isolated from the piston assembly and electrically engages the contact assembly. The predetermined quantity of lubricant may be approximately 0.3 grams.
    • 开关(100)包括具有孔(112)的壳体(110),具有第一端(134)和暴露端(140)的活塞组件(130),在第一端形成的多个凸缘 结束; 封闭第一端的绝缘套管(136),设置在壳体孔中的接触组件(150); 设置在孔中的销(170); 沉积在孔中的预定量的润滑剂(210); 以及弹簧(190),其推动销与活塞组件接合。 绝缘套管和多个凸缘至少部分地布置在套管孔中。 所述销具有:(i)第一位置,其中所述销与所述活塞组件电接触并且与所述接触组件电隔离; 和(ii)第二位置,其中所述销与所述活塞组件电隔离并且电接合所述接触组件。 预定量的润滑剂可以是约0.3克。
    • 7. 发明申请
    • DEVICES AND METHODS FOR PERFORATING A WELLBORE
    • 用于执行井筒的装置和方法
    • WO2009117548A1
    • 2009-09-24
    • PCT/US2009/037615
    • 2009-03-19
    • OWEN OIL TOOLS LPWANG, ZepingPRATT, Dan, W.NOE, Paul
    • WANG, ZepingPRATT, Dan, W.NOE, Paul
    • F42B1/02
    • E21B43/117F42B1/028
    • An apparatus and method for perforating a subterranean formation is disclosed. The apparatus includes a tubular carrier; a charge tube disposed in the tubular carrier; and at least one shaped charge mounted in the charge tube which includes a casing, an explosive material and a liner enclosing the explosive material within the casing. An apex portion of the liner has a cross-sectional thickness greater than a cross-sectional thickness of any other portion of the liner. The cross-sectional thickness of the apex portion may be at least fifty percent thicker than a cross-section of a portion adjacent the apex portion. A density of the apex portion may be greater than the density of any other portions of the liner.
    • 公开了一种用于穿孔地下地层的装置和方法。 该装置包括管状载体; 设置在所述管状载体中的充电管; 以及安装在所述充电管中的至少一个成形电荷器,其包括壳体,爆炸性材料和将所述爆炸材料包封在所述壳体内的衬套。 衬套的顶点部分的横截面厚度大于衬套的任何其它部分的横截面厚度。 顶点部分的横截面厚度可以比与顶部部分相邻的部分的横截面厚至少50%。 顶点部分的密度可以大于衬垫的任何其它部分的密度。