会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • RESPONSIVE LOAD MONITORING SYSTEM AND METHOD
    • 响应负载监测系统和方法
    • WO2011014073A2
    • 2011-02-03
    • PCT/NO2010/000291
    • 2010-07-27
    • RLTEC LTD.HOWE, AndrewBLOOR, KatieWARREN, JoeNORRIS, Tim
    • HOWE, AndrewBLOOR, KatieWARREN, JoeNORRIS, Tim
    • G05B13/04
    • H02J3/14H02J2003/143Y02B70/3225Y02B70/3266Y02P80/11Y02P90/845Y04S20/222Y04S20/242
    • A system employs a method of determining a level of potential responsive-load electrical power network service susceptible to being provided by one or more power consuming devices (100). The method includes: (a) determining operating characteristics of power consuming devices; (b) developing a parameterized numerical model of operation of the power consuming devices based upon the determined operating characteristics; (c) developing an operating regime using the numerical model and a set of operating rules for the devices for providing responsive-load electrical power network service; (d) applying the operating regime to each of the devices; and (e) monitoring operating characteristics of the power consuming devices (100) after installation for verifying their responsive-load electrical power network service. Optionally, the devices are operable to function autonomously to provide their responsive- load electrical power network service. Optionally, the parameterized numerical model of operation describes a fullest extent to which the power consuming devices are capable of providing responsive-load electrical power network service.
    • 系统采用一种确定易受一个或多个功率消耗装置(100)提供的潜在响应负荷电力网络服务水平的方法。 该方法包括:(a)确定耗电装置的运行特性; (b)基于确定的操作特性开发功耗装置的操作的参数化数值模型; (c)使用数字模型和用于提供响应负荷电力网络服务的装置的一组操作规则来开发操作机构; (d)将操作制度应用于每个装置; 以及(e)在安装之后监视电力消耗装置(100)的操作特性,以验证其响应负载电力网络服务。 可选地,这些设备可操作以自主地运行以提供其响应负载电力网络服务。 可选地,参数化的数字操作模型描述了功耗设备能够提供响应负载电力网络服务的最大程度。
    • 4. 发明申请
    • VIRTUAL POWER STATION
    • 虚拟电力站
    • WO2012114114A2
    • 2012-08-30
    • PCT/GB2012/050417
    • 2012-02-23
    • RESPONSIVELOAD LIMITEDCARVER, Andrew JohnWARREN, Joseph DanielBLOOR, Katie
    • CARVER, Andrew JohnWARREN, Joseph DanielBLOOR, Katie
    • H02J3/14
    • H02J3/14Y02B70/3225Y04S20/222
    • The virtual power station (10) includes electrical power generators (20) for providing electrical power via an electrical power distribution network (40, 50) to power consuming devices (60). The virtual power station (10) further includes responsive load controls (120) with associated responsive loads (30). The responsive load controls (120) control power consumption of the responsive loads (30) with respect to a physical variable of the electrical power distribution network (40, 50) for stabilizing operation of the electrical power distribution network (40, 50). The responsive loads (30) execute a response signature and monitor and communicate their power demand arising from execution of the response signature to a central controller (140). From the information supplied by the responsive loads (30), the central controller (140) determines a measure of available responsive load capacity which, in turn, offers improvements in the management of the supply of power by the virtual power station.
    • 虚拟发电站(10)包括用于经由配电网络(40,50)向耗电装置(60)提供电力的发电机(20)。 虚拟发电站(10)还包括具有相关联的响应负载(30)的响应负载控制(120)。 响应负载控制(120)控制响应负载(30)相对于配电网络(40,40)的物理变量的功率消耗,以稳定配电网络(40,50)的运行。 响应负载(30)执行响应签名并监视并将其响应签名执行产生的功率需求传达给中央控制器(140)。 从响应负载(30)提供的信息中,中央控制器(140)确定可用的响应负载能力的量度,其反过来提供虚拟电站对电力供应的管理的改进。