会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • ARRANGEMENT FOR CONVEYOR INSTALLATIONS
    • 输送机安装的安排
    • WO1989011807A1
    • 1989-12-14
    • PCT/SE1989000272
    • 1989-05-18
    • ETON CONSTRUCTION ABDAVIDSSON, Mikael
    • ETON CONSTRUCTION AB
    • A41H43/02
    • A41H43/02B65G19/025B65G2201/0229
    • Arrangement for conveyor installations having a conveyor belt designed to move a number of product carriers (5) between a number of stations (25) and to pick up workpieces (9) at these. The conveyor belt is designed in the shape of a downward-hanging curve with a lowermost point to which it runs in a downward stretch. Arranged close to this lowermost point is a positioning site (31) for the products which are to be picked up. The product carriers (5) are designed with members (8) for gripping the product so that, when the product carrier is lowered in the downward stretch of the conveyor belt (12), it comes into contact with the product (9) lying below, grips it and moves it onwards in an upward movement along the upward stretch of the conveyor belt.
    • 输送装置的布置,其具有设计成在多个工位(25)之间移动多个产品载体(5)并在其上拾取工件(9)的传送带。 输送带被设计成具有向下悬挂曲线的形状,其具有向下延伸的最低点。 靠近该最低点的排列是要被拾取的产品的定位位置(31)。 产品托架(5)设计有用于夹持产品的构件(8),使得当产品托架在输送带(12)的向下拉伸中降低时,其与位于下方的产品(9)接触 ,沿着传送带的向上伸展向上移动并将其向前移动。