会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • APPARATUS AND METHODS FOR HANDLING CASES
    • 装置和处理方法
    • WO2011119563A8
    • 2012-05-18
    • PCT/US2011029366
    • 2011-03-22
    • DOUGLAS MACHINE INCGUST RONALD MATTHEWTHOMAS JOHNMOSKE ANTHONYEVINK DARREN
    • GUST RONALD MATTHEWTHOMAS JOHNMOSKE ANTHONYEVINK DARREN
    • B31B5/76B65B43/14B65B43/26B65B43/42
    • B65B39/007B31B50/76B31B2100/00B31B2120/30B65B43/185B65B43/265B65B43/42
    • A plow (152) is inserted between first major and minor flaps (14, 17) as a case (12) is slid on parallel slide bars (1 10, 1 12). Thereafter, the case (12) is unfolded by moving a securement device (120) in a linear direction perpendicular to the fold lines between the first major and minor flaps (14, 17) and the first end panel (18), with the case (12) located between parallel locators (130, 132). Pushers (154, 156) push the first and second major flaps (14) and the second minor flap (16) outwardly. The first and second major flaps slide in channels (26) in a queuing guide (22) and a transport guide (48) aligned with the queuing guide (22). The transport guide (48) can be moved forward to receive a funnel (80) in a load position and can be moved rearward to a hand-off position where the transport guide (48) can be pivoted to a horizontal position. The minor flaps (16, 17) are controlled by sliding on an end slide (32) intermediate and parallel to the channels (26) in the queuing guide (22) and by being sandwiched in a deflector (68) and between clamping plates (62) pivotally mounted to the channels (26) in the transport guide (48).
    • 当壳体(12)在平行滑杆(110,112)上滑动时,犁(152)插入在第一主瓣和次翼(14,17)之间。 此后,通过使固定装置(120)沿着与第一主折板(14,17)和第一端板(18)之间的折叠线垂直的线性方向移动来展开壳体(12),壳体 (12)位于平行定位器(130,132)之间。 推动器(154,156)向外推动第一和第二主瓣(14)和第二小折翼(16)。 第一和第二主瓣在排队引导件(22)中的通道(26)和与排队引导件(22)对准的输送引导件(48)中滑动。 输送引导件48可以向前移动以接收处于加载位置的漏斗(80)并且可以向后移动到传送导向器(48)能够枢转到水平位置的切换位置。 小翼(16,17)通过在排队引导件(22)中间并平行于通道(26)的端滑台(32)上滑动并通过夹在偏转器(68)和夹板( 62)枢转地安装到输送引导件(48)中的通道(26)上。