会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD AND APPARATUS FOR SUCTION ANCHOR AND MOORING DEPLOYMENT AND CONNECTION
    • 用于吸引锚和运动部署和连接的方法和装置
    • WO9964684A3
    • 2000-03-23
    • PCT/US9906469
    • 1999-03-26
    • DELMAR SYSTEMS INC
    • BERGERON BILLY J
    • B63B21/22B63B21/27B63B21/50E02D5/80E02D7/00
    • B63B21/27B63B21/22B63B21/50B63B2021/007B63B2021/505E02D5/80E02D2250/0053E02D2250/0061
    • A method for deployment of mooring systems for mobile offshore drilling units and for connecting the same to the mooring lines (76) thereof. An anchor handling vessel (10) having a stern roller (12), one or more suction anchors (70), a deployment connection (73) and a mooring connection (88). The anchor handling vessel has an anchor deployment mechanism incorporating a handling line having a quick-disconnect socket connector (74) for accomplishing movement of the suction anchor over the stern roller to the sea bottom. After deployment of the suction anchor, the handling line is disconnected from the connection and the anchor handling wire (78) is moved from the deployment connection to the mooring connection for mooring the suction anchor to the offshore drilling unit. A plurality of mooring strings are deployed in this matter to properly station the drilling unit.
    • 一种用于部署用于移动式海上钻井单元的系泊系统并将其连接到其系泊系统(76)的方法。 具有船尾辊(12),一个或多个吸力锚(70),展开连接(73)和系泊连接(88)的锚泊处理容器(10)。 锚式处理容器具有锚定装置机构,其包括具有快速断开插座连接器(74)的处理线,用于使所述抽吸锚杆在所述船尾辊上方运动到所述海底。 在部署抽吸锚杆之后,处理线与连接件断开连接,并且锚定处理线(78)从展开连接件移动到系泊连接件,用于将吸引锚泊系到海上钻井单元。 在该事项中部署了多个系泊绳,以适当地安放钻井单元。
    • 2. 发明申请
    • METHOD AND APPARATUS FOR SUCTION ANCHOR AND MOORING DEPLOYMENT AND CONNECTION
    • 用于吸引锚和运动部署和连接的方法和装置
    • WO9964684A8
    • 2001-03-08
    • PCT/US9906469
    • 1999-03-26
    • DELMAR SYSTEMS INC
    • BERGERON BILLY J
    • B63B21/22B63B21/27B63B21/50E02D5/80E02D7/00
    • B63B21/27B63B21/22B63B21/50B63B2021/007B63B2021/505E02D5/80E02D2250/0053E02D2250/0061
    • A method for deployment of mooring systems for mobile offshore drilling units and for connecting the same to the mooring lines (76) thereof. An anchor handling vessel (10) having a stern roller (12), one or more suction anchors (70), a deployment connection (73) and a mooring connection (88). The anchor handling vessel has an anchor deployment mechanism incorporating a handling line having a quick-disconnect socket connector (74) for accomplishing movement of the suction anchor over the stern roller to the sea bottom. After deployment of the suction anchor, the handling line is disconnected from the connection and the anchor handling wire (78) is moved from the deployment connection to the mooring connection for mooring the suction anchor to the offshore drilling unit. A plurality of mooring strings are deployed in this matter to properly station the drilling unit.
    • 一种用于部署用于移动式海上钻井单元的系泊系统并将其连接到其系泊系统(76)的方法。 具有船尾辊(12),一个或多个吸力锚(70),展开连接(73)和系泊连接(88)的锚泊处理容器(10)。 锚式处理容器具有锚定装置机构,其包括具有快速断开插座连接器(74)的处理线,用于使抽吸锚杆在船尾辊上方运动到海底。 在部署抽吸锚杆之后,处理线路与连接件断开连接,并且锚定处理线(78)从展开连接件移动到系泊连接件,用于将吸引锚泊系泊到海上钻井单元。 在该事项中部署多个系泊绳,以正确地安放钻井单元。