会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • IMPLEMENTING A TEST REGIME FOR A NETWORK BASED TELEPHONY SYSTEM
    • 实现基于网络的电话系统的测试方案
    • WO2006099247A2
    • 2006-09-21
    • PCT/US2006/008809
    • 2006-03-10
    • CLARUS SYSTEMS, INC.CONKLIN, DouglasMCGOWAN, KevinKEMPER, JeffLAU, Kalman
    • CONKLIN, DouglasMCGOWAN, KevinKEMPER, JeffLAU, Kalman
    • G06F11/00
    • H04L43/50
    • A process of implementing a test plan for an IP-based telephony network. The process consists initially of installing a system test module as an integral component of the network-based system, whereby test procedures originate within the network-based system, employing system resources rather than outside components to accomplish testing. Further steps are assembling a set of generic functional tests, each test including the components of test elements, each element addressing a single system action, together with verification for completion of such action; test legs, each leg encompassing the actions of a single actor in the test and including interactions between such actors; and a test activity, setting out a single function to be accomplished by the test and combining the functions of one or more test legs, including the interactions among the same. Then the system proceeds by determining the network resources to be tested at a given time, including automatically determining the overall configuration of the network under test, to the extent possible; adding information required to complete the system configuration; building a system model of the network under test; integrating user input regarding system permissions and capabilities; user schedule considerations; and user test standards. Finally, the process concludes by executing the test plan, including the steps of allocating network resources required for test; balancing efficient testing considerations against resource constraints; determining availability of allocated resources; locking resources while in use; and iterating until all required resources have been tested.
    • 实施基于IP的电话网络测试计划的过程。 该过程最初包括将系统测试模块安装为基于网络的系统的组成部分,由此测试程序起源于基于网络的系统,采用系统资源而不是外部组件来完成测试。 进一步的步骤是组装一组通用功能测试,每个测试包括测试元素的组件,每个元素处理单个系统动作,以及完成此类操作的验证; 测试腿,每条腿包含测试中单个演员的动作,包括这些演员之间的相互作用; 和测试活动,设置通过测试完成的单个功能,并组合一个或多个测试腿的功能,包括其中的相互作用。 然后系统通过确定在给定时间进行测试的网络资源,包括尽可能自动地确定被测网络的整体配置; 添加完成系统配置所需的信息; 建立被测网络的系统模型; 整合用户输入关于系统权限和能力; 用户进度考虑; 和用户测试标准。 最后,该过程通过执行测试计划结束,包括分配测试所需的网络资源的步骤; 平衡有效的测试考虑与资源限制; 确定分配资源的可用性; 在使用时锁定资源; 并重复直到所有必需的资源都被测试。