会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • PRECAST INSULATED LOAD BEARING ROOF ELEMENT AND METHODS OF MANUFACTURING A ROOF ELEMENT
    • 预制绝缘负载轴承单元和制造屋顶单元的方法
    • WO2016079212A1
    • 2016-05-26
    • PCT/EP2015/077027
    • 2015-11-18
    • THEDUFFUS V/DAVID JOHN DUFFUS
    • DUFFUS, David John
    • E04B7/22
    • E04B7/22E04B1/665E04B2103/02E04D3/352E04D11/002E04D13/0404
    • The present disclosure relates to a precast load bearing roof deck element for a building comprising an upper floor layer of concrete, a load bearing steel reinforced lower layer of concrete, at least one thermally insulating layer located between and separating the upper floor layer of concrete and the lower layer of concrete, and a plurality of binders extending between the lower layer of concrete and the upper floor layer of concrete, the roof deck element configured to be mounted on a load bearing construction of the building. The disclosure also relates to a roof construction comprising a load bearing construction, such as a column and beam construction, and at least two of the above mentioned precast load bearing roof deck elements, wherein the roof deck elements are positioned side by side forming a gap between the roof deck elements, wherein the distance between the roof elements is between 0 mm and 100 mm, or between 1 mm and 100 mm. Furthermore the present disclosure relates to a method for manufacturing a load bearing roof deck element and a method for installing a roof construction on a load bearing construction of a building.
    • 本发明涉及一种用于建筑物的预制承载屋顶板元件,其包括混凝土的上层,承载钢筋混凝土的下层,至少一个隔热层,位于混凝土的上层之间并分离;以及 混凝土的下层,以及在混凝土的下层和混凝土的上层之间延伸的多个粘合剂,所述屋顶平台元件构造成安装在建筑物的承载结构上。 本公开还涉及一种屋顶结构,其包括负载承载结构,例如柱和梁结构,以及至少两个上述预制承重屋顶板,其中屋顶板元件并排地形成间隙 在屋顶板元件之间,其中屋顶元件之间的距离在0mm至100mm之间,或在1mm至100mm之间。 此外,本公开涉及一种用于制造承重屋顶板元件的方法和在建筑物的承重结构上安装屋顶结构的方法。