会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • DEVICE FOR THE LIFTING OF POWER HAMMERS
    • 提升动力锤的装置
    • WO1983000160A1
    • 1983-01-20
    • PCT/DE1982000136
    • 1982-07-01
    • SAARBERG-INTERPLAN GESELLSCHAFT FÜR ROHSTOFF-, ...STEGMANN, Heinz
    • SAARBERG-INTERPLAN GESELLSCHAFT FÜR ROHSTOFF-, ...
    • C10B45/02
    • C10B45/02
    • In the coking process of coal by the coal compressing process, the coking coal is compressed by power hammers before it is introduced into the coking furnace. Elongate rods (2, 3) comprising power hammers (1) are lifted above the coking coal by means of driven disks (5, 6) which operate by sectors, and are then released. The shafts (7, 9) supporting the disks are mounted individually with respect to the number of hammer rods. The bearing points (22) may be moved simultaneously and in the same direction on either side of the rods of the power hammers and are uniformly driven by a hydraulic system. Consequently, the independent shafts of the disks are set in motion and the disks are pressed against the rods of the corresponding power hammers. A regular and uniform lifting of all the power hammer rods and all the power hammers is obtained.
    • 在采煤压煤过程中,焦煤在被引入焦化炉之前被电锤锤压。 包括动力锤(1)的细长杆(2,3)通过由扇区操作的从动盘(5,6)提升到焦煤上方,然后释放。 支撑盘的轴(7,9)相对于锤杆的数量分别安装。 轴承点(22)可以在电锤的杆的任一侧同时且沿相同的方向移动,并被液压系统均匀地驱动。 因此,盘的独立轴被设置成运动,并且盘被压靠在相应的电锤的杆上。 获得所有功率锤杆和所有电锤的规则和均匀的提升。