会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • CONTRACTION JOINT RAIL
    • 应该计划接头轨道
    • WO1996000822A1
    • 1996-01-11
    • PCT/EP1995002449
    • 1995-06-23
    • RASCOR SPEZIALBAU GMBHSCHMID, René, P.
    • RASCOR SPEZIALBAU GMBH
    • E04B01/68
    • E02D29/16E04B1/6816
    • Contraction joint rail for fitting in a wall (4) to be concreted and the use of such a rail which consists of a strip-like bar (1) with a device fitted to it forming an injection channel (2) extending over the length of the bar (1). The bar (1) may consist of a thin-walled plastic component, sheet zinc or the like. The device forming the injection channel (2) may be a foam strip (12) applied to the bar (1). The bar (1) may be fitted on both sides with a device forming an injection channel (2) and/or have perforations (5) permitting the penetration of a sealing material. The contraction joint rail of the invention is applied to an area of the wall (4) to be concreted and extends over the entire heigh of the wall (4), whereby after the wall (4) has been concreted, sealing material is sprayed into the injection channel (2) thus formed.
    • 形成应该裂纹接头轨道用于安装在待浇筑壁(4)和使用这样的标称裂缝接头轨道的,其安装从近似带状的轨条板(1)与此,注射通道(2)形成装置,横跨所述延伸 延伸轨道板条(1)的长度。 轨道板条(1)可以由薄壁塑料部件,片材或锌等的。 形成装置的注入通道(2)优选为在轨道板条(1)施加泡沫带(12)。 轨道板条(1)可以与(2)形成的设备和/或穿孔(5),其允许的密封材料通过注入通道被设置在两侧。 根据本发明的控制的裂缝接头轨道被引入到浇注混凝土壁(4)的一个区域和延伸越过壁(4)的整个高度,混凝土壁(4)之后密封材料注入到形成注射通道(2) ,