会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • REINFORCED CONCRETE CONSTRUCTION FOR A BUILDING
    • 混凝土施工的用于建筑物
    • WO2008116448A3
    • 2009-06-25
    • PCT/DE2008000465
    • 2008-03-21
    • FRANK GMBH & CO KG MAXKROPMEIER SIMON
    • KROPMEIER SIMON
    • E04B1/21
    • E04B1/215E04C5/02
    • A reinforced concrete construction for a building is disclosed, comprising a pre-fabricated reinforced concrete support (13) and a pre-fabricated or a semi-finished reinforced concrete joist (11), arranged on the prefabricated reinforced concrete support (13). The prefabricated reinforced concrete support (13) comprises a concealed bracket (12, 32, 33, 38), the prefabricated or semi-finished reinforced concrete joist (11) having a flange (15) with a beam shoe (20, 21). The beam shoe (20, 21) lies on the concealed bracket (12, 32, 33, 38) and is fixed to the prefabricated reinforced concrete support (13) by the concealed bracket (12, 32, 33, 38), whereupon a rigid connection between prefabricated reinforced concrete support (13) and the prefabricated or semi-finished reinforced concrete joist (11) is formed.
    • 公开了一种用于具有一预制建筑物中的钢筋混凝土结构钢筋混凝土柱(13),并与在预制钢筋混凝土柱(13),其布置预制或半预制Stahlbetonunterzug(11)。 预制钢筋混凝土柱(13)具有一个隐藏的控制台(12,32,33,38),而预制或半预制Stahlbetonunterzug(11)具有一个下凸缘(15)与梁鞋(20,21)。 位于隐藏的控制台(12,32,33,38)上,并且光束鞋(20,21)的特征在于(13)固定于预制钢筋混凝土柱隐藏控制台(12,32,33,38),预制之间从而 -Stahlbetonstütze(13)和预制或半预制Stahlbetonunterzug(11)是形成弯曲刚性连接。
    • 2. 发明申请
    • STAHLBETONKONSTRUKTION FÜR EIN GEBÄUDE
    • 混凝土施工的用于建筑物
    • WO2008116448A2
    • 2008-10-02
    • PCT/DE2008/000465
    • 2008-03-21
    • MAX FRANK GMBH & CO. KGKROPMEIER, Simon
    • KROPMEIER, Simon
    • E04B1/215E04C5/02
    • Beschrieben wird eine Stahlbetonkonstruktion für ein Gebäude mit einer Fertigteil-Stahlbetonstütze (13) und mit einem an der Fertigteil-Stahlbetonstütze (13) angeordneten Fertigteil- oder Halbfertigteil-Stahlbetonunterzug (11). Die Fertigteil-Stahlbetonstütze (13) weist eine versteckte Konsole (12, 32, 33, 38) auf, während der Fertigteil- oder Halbfertigteil-Stahlbetonunterzug (11) einen Untergurt (15) mit einem Balkenschuh (20, 21) aufweist. Der Balkenschuh (20, 21) liegt auf der versteckten Konsole (12, 32, 33, 38) auf und ist durch die versteckte Konsole (12, 32, 33, 38) an der Fertigteil-Stahlbetonstütze (13) befestigt, wodurch zwischen Fertigteil-Stahlbetonstütze (13) und Fertigteil- oder Halbfertigteil-Stahlbetonunterzug (11) ein biegesteifer Anschluss ausgebildet wird.
    • 公开了一种用于具有一预制建筑物中的钢筋混凝土结构钢筋混凝土柱(13),并与在预制钢筋混凝土柱(13),其布置预制或半预制Stahlbetonunterzug(11)。 预制钢筋混凝土柱(13)具有一个隐藏的控制台(12,32,33,38),而预制或半预制Stahlbetonunterzug(11)具有一个下凸缘(15)与梁鞋(20,21)。 位于隐藏的控制台(12,32,33,38)上,并且光束鞋(20,21)的特征在于(13)固定于预制钢筋混凝土柱隐藏控制台(12,32,33,38),预制之间从而 -Stahlbetonstütze(13)和预制或半预制Stahlbetonunterzug(11)是形成弯曲刚性连接。
    • 3. 发明申请
    • MANDREL SYSTEM FOR CONCRETE CONSTRUCTION
    • 脊柱内固定系统混凝土
    • WO2010075855A4
    • 2010-09-16
    • PCT/DE2009075071
    • 2009-11-25
    • KROPMEIER SIMON
    • KROPMEIER SIMON
    • E04B1/48E01C11/14E04B1/49
    • E04B1/215E04B1/043E04B1/483
    • The invention relates to a mandrel system for an embodiment of a force-fit connection in the expansion joint area between a first concrete component (17) and a second concrete component (13). The second concrete component (13) has a mandrel (24) and sleeve (43) drawn substantially concentrically on the mandrel (24). The first concrete component (17) comprises a sleeve tube (22) for receiving the sleeve (43) and the mandrel (24). The sleeve (43) comprises a sleeve cover (41) and a sleeve foot (42), wherein the sleeve cover (41) and/or sleeve foot (42) comprise a device for fixing the location of the mandrel (24).
    • 心轴系统的第一具体部分(17)和第二混凝土部件(13)之间用于形成kraftschl描述?拉尔端口在伸缩缝。 第二混凝土部分(13)的心轴(24)和一基本上同心饲养装有心轴(24)H?LSE(43)。 第一混凝土部分(17)具有一个H + Llrohr(22),用于接收H + LSE(43)和心轴(24)。 的H + LSE(43)具有一个H + Lsendeckel(41)和H +Lsenfuß(42),其中,H lsendeckel(41)和/或Hlsenfuß?(42)的装置用于固定心轴的位置(24) 包括。
    • 4. 发明申请
    • DORNSYSTEM FÜR DEN BETONBAU
    • 混凝土结构的混凝土系统
    • WO2010075855A1
    • 2010-07-08
    • PCT/DE2009/075071
    • 2009-11-25
    • KROPMEIER, Simon
    • KROPMEIER, Simon
    • E04B1/48E04B1/49E01C11/14
    • E04B1/215E04B1/043E04B1/483
    • Beschrieben wird ein Dornsystem zur Ausbildung eines kraftschlϋssigen Anschlusses im Dehnfugenbereich zwischen einem ersten Betonbauteil (17) und einem zweiten Betonbauteil (13). Das zweite Betonbauteil (13) ist mit einem Dorn (24) und einer im wesentlichen konzentrisch auf den Dorn (24) aufgezogenen Hϋlse (43) ausgestattet. Das erste Betonbauteil (17) weist ein Hϋllrohr (22) zur Aufnahme von Hϋlse (43) und Dorn (24) auf. Die Hϋlse (43) weist einen Hϋlsendeckel (41) und einen Hϋlsenfuβ (42) auf, wobei Hϋlsendeckel (41) und/oder Hϋlsenfuβ (42) eine Vorrichtung zur Lagefixierung des Dorns (24) umfassen.
    • 描述了用于在第一混凝土构件(17)和第二混凝土构件(13)之间的膨胀接头区域中形成摩擦连接的心轴系统。 第二混凝土构件(13)配备有心轴(24)和基本上同心地安装在心轴(24)上的套筒(43)。 第一混凝土构件(17)具有用于接收套筒(43)和心轴(24)的中空管(22)。 套筒(43)具有套筒盖(41)和套筒支脚(42),套筒套(41)和/或套筒支脚(42)包括用于固定销(24)的位置的装置,