热词
    • 1. 发明申请
    • POWER PLANT WITH CO2 CAPTURE AND COMPRESSION
    • 具有二氧化碳捕获和压缩的发电厂
    • WO2009087210A3
    • 2011-05-05
    • PCT/EP2009050205
    • 2009-01-09
    • ALSTOM TECHNOLOGY LTDBLATTER RICHARDDRENIK OLIVIERNAGEL HOLGER
    • BLATTER RICHARDDRENIK OLIVIERNAGEL HOLGER
    • F01K13/02
    • F01K13/02Y02E20/326
    • Since CO2 is identified as a main greenhouse gas, its capture and storage is essential to control of global warming. Flexible operation of CO2 capture and compression equipment will increase the competitiveness of power plants (1 ) designed for CO2 capture and compression and will allow earlier introduction of this kind of plants. The main objective of the present invention is to improve the plants frequency response characteristics by taking advantage of the additional flexibility, which can be realized by controlling the power consumption of the CO2 capture and compression system. One particular aim is to provide a power reserve for under- frequency events without deloading the plant (1 ) to part load. This is achieved by an operating method, in which the power consumption of the CO2 capture system is used to control the net output (D) of the plant (1 ). Besides the method a plant (1 ) designed to operate according to this method is subject of the present invention.
    • 由于二氧化碳被认定为主要的温室气体,其捕获和储存对于控制全球变暖至关重要。 二氧化碳捕获和压缩设备的灵活运行将提高设计用于二氧化碳捕获和压缩的发电厂(1)的竞争力,并允许更早地引进这种植物。 本发明的主要目的是通过利用额外的灵活性来提高工厂的频率响应特性,这可以通过控制二氧化碳捕获和压缩系统的功率消耗来实现。 一个特别的目的是为低频事件提供动力储备,而不会将装置(1)卸载到部分载荷。 这通过操作方法来实现,其中使用CO 2捕集系统的功率消耗来控制设备(1)的净输出(D)。 除了该方法之外,根据本方法设计的工厂(1)是本发明的主题。
    • 3. 发明申请
    • POWER PLANT WITH CO2 CAPTURE AND COMPRESSION
    • 具有二氧化碳捕获和压缩的发电厂
    • WO2009087210A2
    • 2009-07-16
    • PCT/EP2009/050205
    • 2009-01-09
    • ALSTOM Technology LtdBLATTER, RichardDRENIK, OlivierNAGEL, Holger
    • BLATTER, RichardDRENIK, OlivierNAGEL, Holger
    • F01K13/02
    • F01K13/02Y02E20/326
    • Since CO2 is identified as a main greenhouse gas, its capture and storage is essential to control of global warming. Flexible operation of CO2 capture and compression equipment will increase the competitiveness of power plants (1 ) designed for CO2 capture and compression and will allow earlier introduction of this kind of plants. The main objective of the present invention is to improve the plants frequency response characteristics by taking advantage of the additional flexibility, which can be realized by controlling the power consumption of the CO2 capture and compression system. One particular aim is to provide a power reserve for under- frequency events without deloading the plant (1 ) to part load. This is achieved by an operating method, in which the power consumption of the CO2 capture system is used to control the net output (D) of the plant (1 ). Besides the method a plant (1 ) designed to operate according to this method is subject of the present invention.
    • 由于二氧化碳被认定为主要的温室气体,其捕获和储存对于控制全球变暖至关重要。 二氧化碳捕获和压缩设备的灵活运行将提高设计用于二氧化碳捕获和压缩的发电厂(1)的竞争力,并允许更早地引进这种植物。 本发明的主要目的是通过利用额外的灵活性来提高工厂的频率响应特性,这可以通过控制二氧化碳捕获和压缩系统的功率消耗来实现。 一个特别的目的是为低频事件提供动力储备,而不会将装置(1)卸载到部分载荷。 这通过操作方法来实现,其中使用CO 2捕集系统的功率消耗来控制设备(1)的净输出(D)。 除了该方法之外,根据本方法设计的工厂(1)是本发明的主题。
    • 6. 发明申请
    • POWER PLANT AND METHOD OF OPERATING A POWER PLANT
    • 动力装置和操作发电厂的方法
    • WO2013005071A1
    • 2013-01-10
    • PCT/IB2011/002321
    • 2011-07-07
    • ALSTOM TECHNOLOGY LTDMERCIER, JacquesDRENIK, Olivier
    • MERCIER, JacquesDRENIK, Olivier
    • F01K7/40F01K13/02F22D1/00F22D1/32
    • F01K13/02F01K7/40F22D1/003F22D1/325
    • A fossil fuel fired power plant (PP) can provide an improved dynamic response by means of condensate stop and optionally with indirect firing. The power plant (PP) having a water steam cycle comprises six condensate preheaters (21 -26) arranged in series for the preheating by heat exchange with steam extracted from the steam turbines (7-10). Steam extraction lines (23'-26') have a quick-action valve (23"-26") able to stop the extraction steam flow, whereby the additional steam flowing through the turbines enables a large load increase up to 10% within a short time of 10 seconds. In case of a coal-fired power plant (PP), the power plant (PP) comprises a supply silo (45) for pulverized coal that enables a quick increase in supply rate of coal to the boiler (1 ) and of the firing rate. This allows the load increase to be maintained over a longer time period.
    • 化石燃料燃料发电厂(PP)可以通过冷凝水停止和间接燃烧提供改进的动态响应。 具有水蒸汽循环的发电厂(PP)包括六个冷凝预热器(21-26),其串联布置,用于通过与从蒸汽涡轮机(7-10)提取的蒸汽进行热交换进行预热。 蒸汽提取管线(23'-26')具有能够停止提取蒸汽流的快动阀(23“-26”),由此流过涡轮机的附加蒸汽能够在一个 短时间10秒。 在燃煤电厂(PP)的情况下,发电厂(PP)包括用于煤粉的供应料仓(45),其能够快速提高向锅炉(1)供应的煤的供应速率和燃烧速率 。 这允许在更长的时间段内保持负载增加。