会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • SURGE CONTROL OF A PLURALITY OF COMPRESSORS ARRANGED IN SERIES
    • 压缩机系列中多种压缩机的控制
    • WO2011141296A1
    • 2011-11-17
    • PCT/EP2011/056730
    • 2011-04-28
    • Rolls-Royce plcFLETCHER, PaulLAMBERT, CarolineBYGRAVE, Jonathan
    • FLETCHER, PaulLAMBERT, CarolineBYGRAVE, Jonathan
    • F04D27/02
    • F04D27/0261F04D27/0269F04D27/0276F04D27/0284
    • An industrial system for compressing a waste gas product, such as CO 2 , comprising a compressor train (5) having an upstream rotor portion (8) and a downstream rotor portion (10) arranged in flow series with said upstream portion. Each rotor portion (8, 10) comprises one or more compressor stages and said downstream portion is arranged to rotate at a variable relative speed to that of the upstream rotor portion. Sensing equipment (9) for the compressor train is arranged to determine one or more flow conditions and a controller (19) is arranged to receive data indicative of said one or more sensed flow conditions. The controller (19) is arranged to set the rotational speed of the upstream rotor portion (8) based upon the pressure or flow rate of gas upstream of said compressor train and to set operational parameters for said downstream portion (10) so as to maintain a desired surge margin for said upstream rotor portion.
    • 一种用于压缩诸如CO 2的废气产品的工业系统,包括具有上游转子部分(8)和与所述上游部分流动串联布置的下游转子部分(10)的压缩机组(5)。 每个转子部分(8,10)包括一个或多个压缩机级,并且所述下游部分被布置成以与上游转子部分相对的可变相对速度旋转。 布置用于压缩机列车的感测设备(9)以确定一个或多个流量条件,并且控制器(19)被布置成接收指示所述一个或多个感测流量条件的数据。 控制器(19)被设置为基于所述压缩机组上游的气体的压力或流量来设定上游转子部分(8)的转速并设定所述下游部分(10)的操作参数,以便维持 所述上游转子部分的期望喘振裕度。