会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 95. 发明申请
    • A DRAIN APPARATUS FOR A SUBSEA PIPELINE
    • 一种用于管道管道的排水设备
    • WO2018033758A1
    • 2018-02-22
    • PCT/GB2017/052463
    • 2017-08-21
    • TREVELYAN TRADING LTD
    • LIÉBANA YESTE, LauraTREVELYAN THOMAS, Lee
    • E21B43/36B01D17/00B01D19/00
    • E21B43/36B01D17/00B01D19/00B01D19/0042
    • The present invention provides a drain apparatus (200) for use in a subsea pipeline to remove liquid from a multiphase flow in the subsea pipeline. The drain apparatus comprises a first channel (20) for carrying a multiphase flow comprising liquid and gas phases; and liquid extraction means (11, 12, 14, 18) for extracting the liquid phase from the multiphase flow in the first channel (20). The internal diameter of the first channel (20) is substantially the same as an internal diameter of a subsea pipe arranged to carry the multiphase flow in the subsea pipeline, such that a pig travelling along the subsea pipe can pass through the first channel (20). The present invention also provides a subsea pipeline comprising a subsea pipe for transporting a multiphase flow subsea; and at least one drain. The at least one drain is disposed partway along a gradient in the subsea pipe to reduce liquid holdup.
    • 本发明提供了一种用于海底管道中以从海底管道中的多相流中去除液体的排放装置(200)。 排放装置包括用于承载包含液相和气相的多相流的第一通道(20) 和液体提取装置(11,12,14,18),用于从第一通道(20)中的多相流提取液相。 第一通道(20)的内径基本上与布置成在海底管道中承载多相流的海底管的内径相同,使得沿着海底管行进的清管器可以穿过第一通道(20 )。 本发明还提供了一种包括用于运输多相流海底的海底管的海底管线; 和至少一个排水管。 至少一个排水管设置在海底管中的梯度的中途以减少液体滞留。
    • 99. 发明申请
    • VALVE ASSEMBLY
    • 阀组件
    • WO2016106102A2
    • 2016-06-30
    • PCT/US2015/066509
    • 2015-12-17
    • CAMERON INTERNATIONAL CORPORATIONHOPPER, Hans PaulFINN, Fergal
    • HOPPER, Hans PaulFINN, Fergal
    • E21B34/04E21B43/36F16K47/08
    • E21B34/04E21B43/36F16K47/08
    • A valve assembly is provided, the valve assembly comprising a valve housing; an inlet for fluid entering the valve housing; an outlet for fluid leaving the valve housing; a flow control assembly disposed within the valve housing between the inlet and the outlet, whereby fluid entering the valve housing is caused to flow through the flow control assembly, the flow control assembly comprising a cage having apertures therethrough to provide passage for fluid passing from the inlet to the outlet; a closure assembly having a first closure member disposed within the cage and moveable with respect to the cage between a first closed position, in which the first closure member closes the innermost end of all of the apertures in the cage, and a second open position, in which the innermost end of all the apertures in the cage are open; and a second closure member disposed outside the cage and moveable with respect to the cage between a first closed position, in which the second closure member closes the outermost end of all of the apertures in the cage, and a second open position, in which the outermost end of all the apertures in the cage are open.
    • 提供一种阀组件,该阀组件包括阀壳体; 流体进入阀壳体的入口; 用于流体离开阀壳体的出口; 流体控制组件,其设置在所述入口和所述出口之间的所述阀壳体内,由此使进入所述阀壳体的流体流过所述流量控制组件,所述流量控制组件包括具有穿过其中的孔的笼, 出口入口; 闭合组件,其具有设置在所述保持架内的第一闭合部件,并且能够相对于所述保持架在第一闭合位置和第二闭合位置之间移动,所述第一闭合部件闭合所述保持架中的所有孔的最内端, 其中保持架中的所有孔的最内端打开; 以及第二闭合构件,其设置在所述保持架之外并且能够相对于所述保持架在第一闭合位置和第二打开位置之间移动,所述第一关闭位置在所述第一关闭位置和所述第二打开位置之间, 保持架中所有孔的最外端是开放的。
    • 100. 发明申请
    • HANDLING HEAVY SUBSEA STRUCTURES
    • 处理重型SUBSEA结构
    • WO2016071471A3
    • 2016-06-30
    • PCT/EP2015075863
    • 2015-11-05
    • SUBSEA 7 NORWAY AS
    • DAASVATN SIGBJØRN
    • E21B41/00E21B43/017E21B43/36
    • E21B41/0007B63B21/66E21B43/0107E21B43/017E21B43/36
    • A method for transporting and installing a heavy subsea structure such as a subsea processing centre (10) for produced crude oil or natural gas. The method comprises: controlledly flooding at least one ballast tank (52) attached to or incorporated into the structure, to the extent that the structure becomes negatively buoyant at a predetermined towing depth; towing the negatively-buoyant structure at the towing depth by the Controlled Depth Towing Method (CDTM); and, after towing to the installation location, further flooding the ballast tank to lower the structure onto the seabed (64). At the seabed, a fluid transportation pipe (90) of a subsea production installation may be coupled to pipework of the structure.
    • 一种用于运输和安装诸如用于生产的原油或天然气的海底加工中心(10)的重型海底结构的方法。 该方法包括:控制地将至少一个连接到或结合到结构中的压载舱(52)淹没到结构在预定牵引深度处变得负浮力的程度; 通过受控深度牵引方法(CDTM)牵引牵引深度的负浮力结构; 并且在牵引到安装位置之后,进一步淹没压载舱以将结构降低到海底(64)上。 在海底,海底生产设备的流体输送管道(90)可以联接到结构的管道。