    • 6. 发明授权
    • Unitary pile jacking sleeve for installing and compressively loading piling without overhead access and without disrupting a super-structure
    • 一体式起吊套筒,用于安装和压缩加载桩,无需架空通道,不会中断超级结构
    • US07351013B2
    • 2008-04-01
    • US11164454
    • 2005-11-23
    • Scott Anderson
    • Scott Anderson
    • E02D5/64
    • E02D5/64E02D37/00
    • A pile jacking sleeve includes a structural sleeve having a bottom section, an intermediate section and a top section. A stationary plate partitions the bottom section from the top section. A floating plate separates the intermediate section from the top section. A hinged door at the top section allows lateral entry of a piling into the top section when the door is open. An aperture allows insertion and removal of at least one jack into the intermediate section. Actuation of the jack urges the floating plate away from the stationary plate, controllably imparting a load to installed piling. A plurality of bolt holes are also provided in the sleeve to secure piling thereto. The sleeve may be jacketed for additional protection. A plurality of grout windows are also provided in the sleeve to enable filling the structure with a solidifying filler.
    • 顶起套筒包括具有底部部分,中间部分和顶部部分的结构套筒。 固定板将顶部与顶部分隔开。 浮动板将中间部分与顶部分隔开。 当门打开时,顶部的铰链门允许一个堆叠横向进入顶部。 孔允许插入和移除至少一个千斤顶进入中间部分。 千斤顶的启动促使浮板离开固定板,从而可控制地将安装的桩施加给安装桩。 多个螺栓孔也设置在套筒中以固定在其上。 套管可以夹套以便额外保护。 套筒中还设有多个灌浆窗口,以便能够用固化填料填充结构。
    • 7. 发明授权
    • Process for replacing and loading a damaged section of a pile
    • 更换和装载桩的损坏部分的过程
    • US5813800A
    • 1998-09-29
    • US610305
    • 1996-03-04
    • Donald L. Doleshal
    • Donald L. Doleshal
    • E02D5/64E02D7/00E02D11/00
    • E02D5/64
    • Damaged sections of existing piles are replaced with a replacement pile section that includes various segments, including a jack section for sizing and preloading the replacement pile section to original design loads and strengths. The replacement pile section includes at least one coupler having a jack section, which includes a jack for applying a design load to the pile and a plurality of jack screws that are adjusted to accept the design pile load; the hydraulic jack is removed through an access opening, so that the jack screws carry the load; the cavity in the jack section is filled with grout, such as concrete through the access opening, which is then sealed. Other sections of the replacement pile section include, for example, intermediate pile sections, shock absorbing sections, and additional couplers. An alternative embodiment employs two or more balanced hydraulic jacks bearing against external jack flanges fastened to the pile above and below the replaced section.
    • 现有桩的损坏部分被替换为包括各种部分的替换桩部分,包括用于将替换桩部分尺寸和预加载到原始设计载荷和强度的千斤顶部分。 所述更换桩部分包括至少一个具有千斤顶部分的联接器,所述千斤顶部分包括用于向所述桩施加设计载荷的千斤顶和被调节以接受设计桩载荷的多个千斤顶螺钉; 液压千斤顶通过进出口拆下,使得千斤顶螺丝承载负载; 插座部分中的空腔通过进入开口填充水泥浆,例如混凝土,然后密封。 替代桩部分的其他部分包括例如中间桩部分,减震部分和附加的联接器。 替代实施例采用两个或更多个平衡的液压千斤顶,该液压千斤顶抵靠固定在更换部分上方和下方的桩的外部千斤顶法兰。
    • 9. 发明授权
    • Method of repairing poles
    • 修理杆的方法
    • US5337469A
    • 1994-08-16
    • US76677
    • 1993-06-15
    • Enoch Richey
    • Enoch Richey
    • E02D5/64E04H12/22B23P7/00E04C3/34
    • E02D5/64E04H12/2292Y10T29/49618Y10T29/49631Y10T29/4973Y10T29/49735Y10T29/49746
    • A method of repairing utility a pole having a section damaged by an accident or decay includes the steps of severing the utility pole above the location of the damage; removing the section of the utility pole including the damaged portion, and replacing the lower section of the utility pole with a steel stanchion having a platform thereon with a split socket disposed above the platform. The upper section of the utility pole is then laterally slid onto the platform through a window provided by opening the split socket upon removing one of two shells forming the split socket. The split socket is then closed by bolting one shell to the other. A space between the outer surface of the upper section of the utility pole and the inner surface of the split socket is then filled with urethane foam. The stanchion is made of a steel which forms a protective iron oxide coating, which coating is brown in color so as to match the brown color of the utility pole. In a preferred embodiment of the stanchion, the stanchion has a tubular lower portion. The split socket is made of two semicircular shells which are bolted both to one another and to the platform upon which the upper section of the utility pole rests.
    • 一种修理公用事业的方法,具有由事故或朽烂造成损坏的部分的极点包括将电线杆断开在损坏位置上方的步骤; 移除包含损坏部分的电线杆的部分,并用具有平台的钢支柱替换电线杆的下部,其中设置在平台上方的开口插座。 然后,通过拆下形成分体插座的两个外壳中的一个,通过打开开口插座提供的窗口将电线杆的上部横向滑动到平台上。 然后通过将一个外壳螺栓连接到另一个外壳来关闭拆卸插座。 电线杆上部外表面与开口插座内表面之间的空间填充有聚氨酯泡沫。 支柱由形成保护性氧化铁涂层的钢制成,该涂层的颜色为棕色,以匹配电线杆的棕色。 在支柱的优选实施例中,支柱具有管状下部。 分体式插座由两个半圆形壳体组成,两个半壳体彼此螺栓连接,并且连接到工具杆上部的平台所在的平台上。