会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明授权
    • Dust coal boiler, dust coal combustion method, dust coal fuel thermal power generation system, and waste gas purification system for dust coal boiler
    • 粉尘煤锅炉,粉尘煤燃烧法,粉煤燃料热发电系统,粉尘煤锅炉废气净化系统
    • US08961170B2
    • 2015-02-24
    • US12600221
    • 2008-05-14
    • Hisayuki OritaMasayuki TaniguchiAkihito OriiYuki KamikawaHirofumi Okazaki
    • Hisayuki OritaMasayuki TaniguchiAkihito OriiYuki KamikawaHirofumi Okazaki
    • F23D1/00F23C9/00F23J15/00F23L7/00
    • F23C9/003F23D1/00F23J15/006F23J2215/60F23L7/002
    • A pulverized coal thermal power generation system that significantly reduces the amount of NOx emissions from a boiler and does not require a denitration unit is provided. When a denitration unit is not used, performance to remove mercury from a boiler waste gas is reduced. A waste gas purification system for a pulverized coal boiler, that compensates for this is provided.A pulverized coal boiler having a furnace for burning pulverized coal, burners for supplying pulverized coal and air used for combustion into the furnace so as to burn the pulverized coal in an insufficient air state and after-air ports provided on the downstream side of the burners for supplying air used for perfect combustion characterized in that, an air ratio in the furnace is 1.05 to 1.14, and the residence time of a combustion gas from the burner disposed on the uppermost stage to a main after-air port is 1.1 to 3.3 seconds. Preferably, water is mixed in advance with the air supplied from the after-air port so as to increase the specific heat. Furthermore, pulverized coal carrying air in the burner and a part of air used for combustion are mixed together in advance before they are jetted into the furnace.A waste gas purification system having a pulverized coal boiler, an air heater disposed downstream of the pulverized coal boiler for exchanging heat with a boiler waste gas to heat air used for combustion in the pulverized coal boiler, a dust removing unit, and a desulfurizing unit characterized in that, at least one of a halogen gas supply unit, a catalyst unit for oxidizing a mercury gas, and a mercury adsorbent blowing device is provided so as to oxidize mercury included in the waste gas.
    • 提供了一种粉煤发电系统,其显着地减少了来自锅炉的NOx排放量并且不需要脱硝装置。 当不使用脱硝装置时,从锅炉废气中除去汞的性能降低。 提供了一种用于粉煤锅炉的废气净化系统,用于补偿这一点。 一种粉煤锅炉,其具有用于燃烧粉煤的炉,用于将粉煤供应的燃烧器和用于燃烧的空气进入炉中,以便在不充分的空气状态下燃烧粉煤,并且设置在燃烧器的下游侧的后空气口 用于提供用于完全燃烧的空气,其特征在于,炉中的空气比为1.05至1.14,并且来自设置在最上层的燃烧器的燃烧气体的停留时间为1.1至3.3秒 。 优选地,预先将水与从后空气供给的空气混合,以增加比热。 此外,在燃烧器内携带空气的粉煤和用于燃烧的空气的一部分在喷射到炉中之前预先混合在一起。 一种具有粉煤锅炉的废气净化系统,设置在粉煤锅炉下游的空气加热器,用于与锅炉废气进行热交换,以加热用于粉煤锅炉中的燃烧的空气,除尘单元和脱硫单元 其特征在于,提供卤素气体供给单元,氧化汞气体的催化剂单元和汞吸收剂吹送装置中的至少一种,以氧化废气中所含的汞。