会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Method for optimizing hard handoffs in CDMA network
    • CDMA网络硬切换优化方法
    • US06671265B1
    • 2003-12-30
    • US09250661
    • 1999-02-16
    • Yun-Seok HwangPyeong-Hwan Wee
    • Yun-Seok HwangPyeong-Hwan Wee
    • H04Q720
    • H04W24/08H04W36/165
    • Disclosed is a method for optimizing hard handoffs, e.g., between Mobile Switching Centers in a CDMA network. In the method, preliminary conditions for a hard handoff test are first set up. Idle handoffs are then performed in a hard handoff area, log data for the idle handoffs is analyzed and adjustments to communication equipment are made accordingly. Next, hard handoff tests are conducted in a traffic state in the hard handoff area. Log data of the hard handoff tests are analyzed and further adjustments to communication equipment are made if hard handoff performance during the hard handoff tests is determined to be unsatisfactory. A final hard handoff confirmation test is then performed in the hard handoff area following the latter communication equipment adjustments.
    • 公开了一种用于优化硬切换的方法,例如在CDMA网络中的移动交换中心之间。 在该方法中,首先建立了硬切换测试的初步条件。 然后在硬切换区域中执行空闲切换,分析用于空闲切换的日志数据,并相应地对通信设备进行调整。 接下来,硬切换测试在硬切换区域的交通状态中进行。 对硬切换测试的日志数据进行分析,如果硬切换测试中的硬切换性能被确定为不令人满意,则进行通信设备的进一步调整。 然后在后面的通信设备调整之后,在硬切换区域中执行最终的硬切换确认测试。