会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明授权
    • Selecting best-fit digital lockers for packages
    • 选择最适合数字储物柜的包装
    • US09547962B2
    • 2017-01-17
    • US14339383
    • 2014-07-23
    • Tetsuro Motoyama
    • Tetsuro Motoyama
    • G06Q10/08G08B5/36H04B1/38G07F17/12G06Q10/04
    • G08B5/36G06Q10/04G06Q10/0836G07F17/12H04B1/38
    • Techniques are provided for receiving a request to store an item at a locker facility; determining a first plurality of locker compartments that are available for storing items at a first locker facility; receiving data that indicates item-physical-dimensions of the item; determining whether, based at least in part on the item-physical dimension of the item and locker-physical-dimensions of each locker compartment from the first plurality of locker compartments that are available for storing items, one or more first locker compartments from the first plurality of locker compartments are available; and if so, selecting a first locker compartment from the one or more first locker compartments; determining a first locker identifier of the first locker compartment from the one or more first locker compartments; and generating and transmitting a first response message, which includes the first locker identifier of the first locker compartment.
    • 提供技术用于接收将物品存储在更衣室的请求; 确定可用于在第一更衣室设备处存储物品的第一多个储物柜隔间; 接收指示物品的物品尺寸的数据; 确定至少部分地基于所述物品的物品 - 物理尺寸和每个储物柜的物理尺寸与可用于存储物品的第一多个储物柜隔间的物理尺寸,从第一个或多个第一储物柜隔室 多个储物柜可用; 如果是,则从所述一个或多个第一储物柜隔间选择第一更衣室; 从所述一个或多个第一储物柜确定所述第一储物柜的第一储物柜识别符; 以及生成和发送第一响应消息,所述第一响应消息包括所述第一更衣室的第一锁定器标识符。
    • 7. 发明授权
    • Digital locker delivery system
    • 数码柜送货系统
    • US09453758B2
    • 2016-09-27
    • US14339386
    • 2014-07-23
    • Tetsuro Motoyama
    • Tetsuro Motoyama
    • G01G19/52G01G19/414
    • G01G19/414G01G19/52G06Q20/208G07F17/12
    • Techniques are provided for determining, by a sensor, a weight of an item placed in a locker compartment; transmitting, to a locker controller, data indicating the weight of the item placed in the locker compartment; receiving, from the sensor, the data indicating the weight; transmitting the data from the locker controller to a locker manager; receiving, from the locker controller, the data indicating the weight of the item placed in the locker compartment; receiving at the locker manager a reference weight for the item; verifying the weight of the item placed in the locker compartment based at least in part upon the received data and the reference weight for the item placed in the locker compartment; and generating and transmitting a report message indicating whether the item has been delivered to the locker compartment.
    • 技术被提供用于通过传感器确定放置在更衣室中的物品的重量; 向储物柜控制器发送指示放置在储物柜中的物品的重量的数据; 从传感器接收指示重量的数据; 将数据从储物柜控制器发送到储物柜管理器; 从储物柜控制器接收指示放置在储物柜中的物品的重量的数据; 在物品管理员处收到物品的参考重量; 至少部分地基于接收到的数据和放置在更衣室中的物品的参考重量来验证放置在储物柜中的物品的重量; 以及生成和发送一个报告消息,指示该物品是否被传送到更衣室。
    • 9. 发明授权
    • Managing to-do lists in task schedules in a project management system
    • 在项目管理系统中的任务计划中管理待办事项列表
    • US08706768B2
    • 2014-04-22
    • US12122514
    • 2008-05-16
    • Tetsuro MotoyamaAvery Fong
    • Tetsuro MotoyamaAvery Fong
    • G06F17/00G06F17/30
    • G06Q10/06G06Q10/109
    • A project management system manages project schedule data using separate current and historical task schedule data structures. In general, current schedule data is stored separately from historical schedule data, so that the current schedule data may be retrieved separately from the historical task schedule data. The project management system may also maintain unscheduled tasks as “to-do lists.” Tasks may be added to a member's schedule without specifying any planned dates and the tasks are added to the database. The tasks have an associated revision number of 0 to indicate that the tasks were added, but not yet scheduled. The tasks are displayed in the member schedule editor and in Web page schedules. The tasks may then be displayed in the member schedule editor and in Web page schedules in a manner that allows a user to readily determine that the tasks are “to-do list” tasks.
    • 项目管理系统使用单独的当前和历史任务计划数据结构来管理项目进度数据。 通常,当前日程数据与历史计划数据分开存储,从而可以与历史任务调度数据分离地检索当前日程数据。 项目管理系统还可以将非计划任务作为“待办事项列表”进行维护。可以将任务添加到成员的计划中,而不指定任何计划日期,并将任务添加到数据库。 这些任务的修订版本号为0,表示已添加但尚未安排任务。 任务显示在成员计划编辑器和网页计划中。 然后,任务可以以允许用户容易地确定任务是“待办事项列表”任务的方式显示在成员计划编辑器和网页调度中。