会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • PUMP ASSEMBLY STORAGE BOX AND WORK PLATFORM METHOD AND APPARATUS
    • US20160332774A1
    • 2016-11-17
    • US15155917
    • 2016-05-16
    • Daniel Ness
    • Daniel Ness
    • B65D19/02B65D88/12B65D19/06
    • B65D19/02B65D19/06B65D88/129B65D2590/0066B65D2590/0091
    • A method of transporting fluid containing tanks and of off loading the fluid contents of the tanks. Providing a frame having a base with a floor, a front, a rear, and upper and lower end portions, the frame including a plurality of side walls extending upwardly from the base and including at least left and right side walls. Mounting a plurality of gates to the frame, each spanning between two corner columns, each gate being movable between open and closed positions, the open position of each gate providing an open doorway, the gates enabling a fork lift to place a selected one of the tanks on the floor by moving the selected load module laterally through a said open doorway. The floor having a plurality of load holding positions. Placing one or more tanks and a work platform on said floor, wherein the work platform has a work surface and a storage area, and a folding staircase that is movable between upper and lower positions, wherein in the lower position stairs are provided that enable a user to climb the stairs and occupy the platform work surface and wherein in the upper position the stairs are positioned above the work surface. The gates enabling removal of any one of the tanks or the work platform laterally when a gate is opened and without removing any other tank. Transporting the frame from a beginning location to an ending location, and wherein the work platform remains on the frame.
    • 5. 发明授权
    • Ice jacketed cooking pot
    • 冰夹套烹饪锅
    • US08336450B1
    • 2012-12-25
    • US12730893
    • 2010-03-24
    • Daniel Ness
    • Daniel Ness
    • A47J27/02G07F9/10B65D83/72
    • A47J27/02A47J44/02
    • An ice jacketed cooking apparatus provides a base that supports a plurality of legs that hold a cooking pot at an elevated position above the base. This enables conventional burners to be placed underneath the pot and upon the base during cooking period. A jacket surrounds the cooking pot and enables ice and water to be held in close proximity to the cooking pot and around the cooking pot at a selected time after cooking is completed. The ice enables spicy liquid such as pepper or salt infused water to be cooled quickly without diluting the pepper or spice or salt infused water after cooking is completed.
    • 一个冰夹套的烹饪设备提供了一个底座,其支撑多个腿部,其将烹饪锅保持在基座上方的升高位置。 这使得常规燃烧器可以在烹饪期间放置在锅底部和底座上。 夹套围绕烹饪锅,并且在烹饪完成之后的选定时间使冰和水保持在烹饪锅附近和烹饪锅周围。 在烹饪完成后,冰使辣椒或盐水等辛辣液体快速冷却,而不会稀释胡椒或香料或盐水。
    • 6. 发明申请
    • OFFSHORE CARGO RACK FOR USE IN TRANSFERRING PALLETIZED LOADS BETWEEN A MARINE VESSEL AND AN OFFSHORE PLATFORM
    • 海运货架用于转运海上船只和海上平台之间的海上卸货货物
    • US20120285910A1
    • 2012-11-15
    • US13210759
    • 2011-08-16
    • Daniel Ness
    • Daniel Ness
    • F16M13/00B23P17/04
    • B65F1/1615B65D19/06B65D19/44B65D2519/008E21B21/01Y10T29/49826Y10T137/4673Y10T137/474
    • A cargo rack for transferring loads between a marine vessel and an offshore marine platform (for example, oil and gas well drilling or production platform) provides a frame having a front, a rear, and upper and lower end portions. The lower end of the frame has a perimeter beam base, a raised floor and a pair of open-ended parallel fork tine tubes or sockets that communicate with the perimeter beam at the front and rear of the frame, preferably being structurally connected (e.g., welded) thereto. Openings in the perimeter beam base align with the forklift tine tubes or sockets. The frame includes a plurality of fixed side walls extending upwardly from the perimeter beam that include at least left and right side walls. A plurality of gates are movably mounted on the frame including a gate at least at the front and at least at the rear of the frame, each gate being movable between open and closed positions, the gates enabling a forklift to place loads on the floor by accessing either the front of the frame or the rear of the frame. Each gate can be pivotally attached to a fixed side wall. The frame has vertically extending positioning beams or lugs that segment the raised floor into a plurality of load-holding positions. Each load holding position has a plurality of positioning beams or lugs that laterally hold a load module (e.g., palletized load) in position once a load is placed on the raised floor.
    • 用于在船舶和近海海洋平台(例如油气井钻井或生产平台)之间传送载荷的货架提供了具有前,后和上,下端部的框架。 框架的下端具有周边梁基座,高架地板和一对开口平行叉齿管或插座,其与框架前后的周边梁连通,优选在结构上连接(例如, 焊接)。 周边梁底座的开口与叉车叉管或插座对齐。 框架包括从周边梁向上延伸的至少包括至少左右侧壁的多个固定侧壁。 多个门可移动地安装在框架上,包括至少在框架的前部和至少在后部的门,每个门可在打开和关闭位置之间移动,门能使叉车通过 访问框架的前部或框架的后部。 每个门可以枢转地附接到固定的侧壁。 框架具有垂直延伸的定位梁或凸耳,其将升高的地板分段成多个负载保持位置。 一旦负载被放置在高架地板上,每个负载保持位置具有多个定位梁或凸耳,其将负载模块(例如,托盘化负载)横向地保持在适当位置。
    • 7. 发明授权
    • Process and apparatus for a combined casting and rolling installation
    • 组合铸造和轧制设备的工艺和设备
    • US08276647B2
    • 2012-10-02
    • US12936218
    • 2009-03-04
    • Gerald HohenbichlerMichael JescheDaniel NessWolfgang PeitlHeinrich PuehringerAlois SeilingerRobert Andrew Shore
    • Gerald HohenbichlerMichael JescheDaniel NessWolfgang PeitlHeinrich PuehringerAlois SeilingerRobert Andrew Shore
    • B22D11/12B22D11/126B21B1/46
    • B22D11/1206B21B1/463B21B15/0007B21B2015/0014Y10T29/49989Y10T29/49991Y10T29/5184
    • A method and an apparatus for producing hot-rolled products in a combined casting-rolling installation. A method and a combined casting-rolling installation with which an uninterrupted continuous casting process can be maintained not only when there is a planned interruption to production but also when there is an unplanned interruption to production, occurring for example in a heating zone, a finishing mill train, a cooling zone or a storage device. These method steps are carried out to bridge an interruption in production in the part of the installation that is downstream of the cutting-up and delivering device (6): a) cutting off a strand portion (21) of the continuously produced preliminary material (3) by means of a first shears (9); b) raising the tail part of the strand portion (21) from the roller table (4) by means of a raising device (11); c) breaking up the preliminary material (3) passing the first shears (9) into pieces of scrap (19) by means of the first shears (9) into pieces of scrap (19) by means of the first shears (9), delivering the pieces of scrap (19) and removing the strand portion (21) unit the operational readiness of the combined casting-rolling installation is restored.
    • 一种用于在组合式轧制设备中生产热轧产品的方法和设备。 一种方法和组合的铸造轧制装置,不仅在生产计划中断时也可以维持不间断的连续铸造工艺,而且当存在例如在加热区域中发生的计划外的生产中断时, 磨坊,冷却区或存储设备。 执行这些方法步骤以弥补在切割和传送装置(6)下游的安装部分中的生产中断:a)切断连续生产的预备材料的股线部分(21) 3)通过第一剪(9); b)通过升高装置(11)从辊台(4)上升股线部分(21)的尾部; c)通过第一剪切机(9)将通过第一剪切机(9)将第一剪切机(9)通过废料(19)的碎片(19)分解成碎片(19)的初步材料(3) 输送废料块(19)并取出股线部分(21),可以恢复组合式轧制设备的操作准备。