会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Data migrating method taking end time into consideration
    • 考虑结束时间的数据迁移方法
    • US08171245B2
    • 2012-05-01
    • US12871961
    • 2010-08-31
    • Tetsuya MaruyamaYuichi TaguchiMasayasu AsanoMasayuki Yamamoto
    • Tetsuya MaruyamaYuichi TaguchiMasayasu AsanoMasayuki Yamamoto
    • G06F12/16
    • G06F3/0665G06F3/0607G06F3/061G06F3/0647G06F3/067
    • There is provided a data migrating method including the steps of: calculating, in a case where data stored in a volume is migrated to another volume, a required period of time for migrating the data based on a size of data to be migrated and volume configuration information on the volume in which the migrated data is stored and the volume to which the data is to be migrated; determining a start time at which the data migration starts to generate a volume migration plan; setting a priority of the generated volume migration plan; prioritizing, in a case where a periods of time during which the generated volume migration plan is executed and a period of time during which an existing volume migration plan is executed are overlapped with each other, and changing the start time of at least one of those volume migration plans having a lower priority.
    • 提供了一种数据迁移方法,包括以下步骤:在存储在卷中的数据被迁移到另一卷的情况下,基于要迁移的数据的大小和卷配置来计算迁移数据所需的时间段 存储迁移数据的卷的信息以及要迁移数据的卷; 确定数据迁移开始的开始时间以生成卷迁移计划; 设置生成的卷迁移计划的优先级; 在执行生成的卷迁移计划的时间段和执行现有卷迁移计划的时间段彼此重叠的同时,改变其中的至少一个的开始时间, 卷迁移计划具有较低的优先级。
    • 8. 发明授权
    • Data migrating method taking end time into consideration
    • 考虑结束时间的数据迁移方法
    • US07809905B2
    • 2010-10-05
    • US11968236
    • 2008-01-02
    • Tetsuya MaruyamaYuichi TaguchiMasayasu AsanoMasayuki Yamamoto
    • Tetsuya MaruyamaYuichi TaguchiMasayasu AsanoMasayuki Yamamoto
    • G06F12/16
    • G06F3/0665G06F3/0607G06F3/061G06F3/0647G06F3/067
    • There is provided a data migrating method including the steps of: calculating, in a case where data stored in a volume is migrated to another volume, a required period of time for migrating the data based on a size of data to be migrated and volume configuration information on the volume in which the migrated data is stored and the volume to which the data is to be migrated; determining a start time at which the data migration starts to generate a volume migration plan; setting a priority of the generated volume migration plan; prioritizing, in a case where a periods of time during which the generated volume migration plan is executed and a period of time during which an existing volume migration plan is executed are overlapped with each other, and changing the start time of at least one of those volume migration plans having a lower priority.
    • 提供了一种数据迁移方法,包括以下步骤:在存储在卷中的数据被迁移到另一卷的情况下,基于要迁移的数据的大小和卷配置来计算迁移数据所需的时间段 存储迁移数据的卷的信息以及要迁移数据的卷; 确定数据迁移开始的开始时间以生成卷迁移计划; 设置生成的卷迁移计划的优先级; 在执行生成的卷迁移计划的时间段和执行现有卷迁移计划的时间段彼此重叠的同时,改变其中的至少一个的开始时间, 卷迁移计划具有较低的优先级。