热词
    • 1. 发明授权
    • Tubingless electrical submersible pump installation
    • 无油电潜泵安装
    • US07748449B2
    • 2010-07-06
    • US11680429
    • 2007-02-28
    • Terry R. BussearGrant F. Smith
    • Terry R. BussearGrant F. Smith
    • E21B47/10E21B43/00
    • E21B43/128
    • A method of producing a well utilizes a submersible pump run on a line, such as braided wire rope, that includes power conductors. The operator sets a packer in the casing, the packer having a check valve and a tieback receptacle. The operator pressure tests the integrity of the casing above the packer, and if it passes, then runs the pump assembly on the line. The pump assembly has a shroud with a downward extending extension that seals to the passage of the packer. If the pressure test of the casing fails, the operator runs a liner into the well and engages the tieback receptacle. A smaller diameter pump is then lowered on a line into the liner and into engagement with the packer.
    • 生产井的方法利用在包括电力导体的诸如编织钢丝绳的线上运行的潜水泵。 操作人员将封隔器设置在外壳中,封隔器具有止回阀和回收容器。 操作员压力测试封隔器上方的外壳的完整性,如果通过,则将泵组件运行在管路上。 泵组件具有带有向下延伸的延伸部的护罩,其密封到封隔器的通道。 如果套管的压力测试失败,操作者将衬管运入井中并与夹套接合。 然后,较小直径的泵在一条线上下降到衬套中并与封隔器接合。
    • 2. 发明申请
    • Tubingless Electrical Submersible Pump Installation
    • 无管电潜泵安装
    • US20080202748A1
    • 2008-08-28
    • US11680429
    • 2007-02-28
    • Terry R. BussearGrant F. Smith
    • Terry R. BussearGrant F. Smith
    • E21B49/08
    • E21B43/128
    • A method of producing a well utilizes a submersible pump run on a line, such as braided wire rope, that includes power conductors. The operator sets a packer in the casing, the packer having a check valve and a tieback receptacle. The operator pressure tests the integrity of the casing above the packer, and if it passes, then runs the pump assembly on the line. The pump assembly has a shroud with a downward extending extension that seals to the passage of the packer. If the pressure test of the casing fails, the operator runs a liner into the well and engages the tieback receptacle. A smaller diameter pump is then lowered on a line into the liner and into engagement with the packer.
    • 生产井的方法利用在包括电力导体的诸如编织钢丝绳的线上运行的潜水泵。 操作人员将封隔器设置在外壳中,封隔器具有止回阀和回收容器。 操作员压力测试封隔器上方的外壳的完整性,如果通过,则将泵组件运行在管路上。 泵组件具有带有向下延伸的延伸部的护罩,其密封到封隔器的通道。 如果套管的压力测试失败,操作者将衬管运入井中并与夹套接合。 然后,较小直径的泵在一条线上下降到衬套中并与封隔器接合。