会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明申请
    • MASTER STATION UNIT AND METHOD OF ALLOCATING GRANT
    • 主站单元和分配授权方法
    • US20110311221A1
    • 2011-12-22
    • US13148765
    • 2009-02-10
    • Hiroaki MukaiYoshifumi HottaMasaki Tanaka
    • Hiroaki MukaiYoshifumi HottaMasaki Tanaka
    • H04B10/08
    • H04J3/1694H04Q11/0067H04Q2011/0064
    • In a PON system including a high-speed optical signal of a high transmission speed and a low-speed optical signal the speed of which is lower than that of the high-speed optical signal, the PON system employing TDMA system for upward signal transmission, an OLT controls transmission and reception of the low-speed optical signal and the high-speed optical signal and allocates a grant to a slave station unit connected to the OLT. The OLT includes: a traffic monitoring part for measuring the amount of traffic of data received from a high-speed ONU that is a slave station unit that makes communications using the high-speed optical signal; and a bandwidth allocating part for allocating a grant to a low-speed ONU on the basis of report information acquired from the low-speed ONU that is a slave station unit that makes communications using the low-speed optical signal, the bandwidth allocating part allocating a grant to the high-speed ONU on the basis of report information acquired from the high-speed ONU, a grant allocated in a previous cycle, and a result of measurement of the amount of traffic in the previous cycle acquired from the traffic monitoring part.
    • 在具有高传输速度的高速光信号和速度低于高速光信号的低速光信号的PON系统中,采用TDMA系统用于向上信号传输的PON系统, OLT控制低速光信号和高速光​​信号的发送和接收,并向连接到OLT的从站单元分配许可。 OLT包括:业务监控部分,用于测量从作为进行使用高速光信号的通信的从站单元的高速ONU接收的数据的业务量; 以及带宽分配部,其基于从作为进行使用所述低速光信号的通信的从站单位的低速ONU获取的报告信息,向低速ONU分配许可,所述带宽分配部分配 基于从高速ONU获取的报告信息,在前一周期中分配的授权以及从交通监控部分获得的前一周期中的业务量的测量结果,向高速ONU授予 。