会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • HIGHLY DENSIFIED PV MODULE
    • 高密度光伏组件
    • US20160111573A1
    • 2016-04-21
    • US14919648
    • 2015-10-21
    • TENKSOLAR, INC.
    • Dallas W. MeyerLowell J. BergSteven E. Wheeler
    • H01L31/05G01R31/40H02S40/34H01L31/049
    • H01L31/049H01L31/042H02S30/10H02S40/36Y02E10/50
    • In an example, a photovoltaic (PV) module includes multiple PV cells, a continuous backsheet, a circuit card, and a buried first polarity contact. The PV cells are arranged in rows and columns. The continuous backsheet is positioned behind the PV cells, includes a ground plane for the PV cells, and is electrically coupled between a first row and a last row of the PV cells. The circuit card is mechanically coupled to a back of the PV module and includes a first connector with a first polarity and a second connector with an opposite second polarity. The buried first polarity contact is positioned behind the PV cells, is electrically coupled to a back of each PV cell in one of the rows of the PV cells, and extends through a slot formed in the continuous backsheet to electrical contact with the first connector of the circuit card.
    • 在一个示例中,光伏(PV)模块包括多个PV电池,连续的底片,电路卡和埋入的第一极性触点。 PV电池以行和列排列。 连续的底片位于PV电池的后面,包括用于PV电池的接地平面,并且电耦合在PV电池的第一行和最后一行之间。 电路卡机械耦合到PV模块的背面并且包括具有第一极性的第一连接器和具有相反第二极性的第二连接器。 埋入的第一极性触点位于PV电池的后面,电耦合到PV电池的一行中的每个PV电池的背面,并且延伸穿过形成在连续底片中的槽与第一连接器的第一连接器电接触 电路卡。
    • 6. 发明申请
    • SOLAR POWER GENERATION SYSTEM
    • 太阳能发电系统
    • US20160329719A1
    • 2016-11-10
    • US15147768
    • 2016-05-05
    • TENKSOLAR, INC.
    • Dallas W. MeyerChongfeng ZhengJuncheng TanQi Qui
    • H02J3/38H02M7/44
    • H02J3/383Y02E10/563
    • In an example, a solar power generation system includes solar panels, DC optimizers, and inverters. The numbers of the solar panels and the DC optimizers are both N, and the number of the inverters is M. An output of each solar panel is connected to a DC optimizer. The DC optimizer is mainly used to track the maximum power point of the solar panel and stabilize the current, thereby maximizing the output power of the solar panel. Moreover, outputs of all DC optimizers are connected in parallel to construct a DC bus, inputs of the M inverters are connected in parallel, the M inverters whose inputs are connected in parallel extract current from the DC bus, and outputs of the M inverters are also connected in parallel to the same power grid. Advantages of safety, reliability and high power generation efficiency are implemented.
    • 在一个例子中,太阳能发电系统包括太阳能电池板,直流优化器和逆变器。 太阳能电池板和DC优化器的数量均为N,逆变器数量为M.每个太阳能电池板的输出端连接到DC优化器。 DC优化器主要用于跟踪太阳能电池板的最大功率点并稳定电流,从而最大化太阳能电池板的输出功率。 此外,所有直流优化器的输出并联连接构成直流母线,M个逆变器的输入端并联,其输入并联连接的M个逆变器从直流母线提取电流,M个逆变器的输出为 也并联连接到同一个电网。 实施安全性,可靠性和高发电效率的优点。