会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Integration of job shop scheduling with discreet event simulation for manufacturing facilities
    • 将工作车间调度与制造设施的谨慎事件模拟相结合
    • US07702411B2
    • 2010-04-20
    • US11756356
    • 2007-05-31
    • Sugato BagchiSoumyadip GhoshJayant R. Kalagnanam
    • Sugato BagchiSoumyadip GhoshJayant R. Kalagnanam
    • G06F19/00
    • G05B19/41865G05B19/41885G05B2219/32252G05B2219/32301G06Q10/06G06Q10/06312
    • A method and system for integrating job shop scheduling with discrete event simulation for manufacturing facilities are provided. In one aspect a simulator simulates discrete events of a facility using a job schedule generated by a scheduler. The simulator simulates the facility based on one or more local rules, one or more resources, and one or more parameters associated with said locals rules and said resources. The simulator further models said one or more parameters as random variables and using said random variables in its simulation of the facility. The scheduler receives feedback based on output from the simulating step. The feedback includes at least an instruction to the scheduler to include at least one of said one or more resource and to change said one or more parameters based on said modeling of said one or more parameters as random variables. The scheduler uses the feedback for generating an updated schedule.
    • 提供了一种将作业车间调度与制造设施的离散事件仿真相结合的方法和系统。 在一个方面,模拟器使用由调度器生成的作业调度来模拟设施的离散事件。 模拟器基于一个或多个本地规则,一个或多个资源以及与所述本地规则和所述资源相关联的一个或多个参数来模拟设备。 模拟器进一步将一个或多个参数模拟为随机变量,并在其设备的仿真中使用所述随机变量。 调度器基于模拟步骤的输出接收反馈。 所述反馈至少包括指令,所述调度器至少包括所述一个或多个资源中的至少一个,并且基于所述一个或多个参数的所述建模来将所述一个或多个参数改变为随机变量。 调度器使用反馈来生成更新的时间表。
    • 8. 发明申请
    • INTEGRATION OF JOB SHOP SCHEDULING WITH DISCRETE EVENT SIMULATION FOR MANUFACTURING FACILITIES
    • 以制造设备的离散事件模拟整理工作范围调度
    • US20080300705A1
    • 2008-12-04
    • US11756356
    • 2007-05-31
    • Sugato BagchiSoumyadip GhoshJayant R. Kalagnanam
    • Sugato BagchiSoumyadip GhoshJayant R. Kalagnanam
    • G06F19/00
    • G05B19/41865G05B19/41885G05B2219/32252G05B2219/32301G06Q10/06G06Q10/06312
    • A method and system for integrating job shop scheduling with discrete event simulation for manufacturing facilities are provided. In one aspect a simulator simulates discrete events of a facility using a job schedule generated by a scheduler. The simulator simulates the facility based on one or more local rules, one or more resources, and one or more parameters associated with said locals rules and said resources. The simulator further models said one or more parameters as random variables and using said random variables in its simulation of the facility. The scheduler receives feedback based on output from the simulating step. The feedback includes at least an instruction to the scheduler to include at least one of said one or more resource and to change said one or more parameters based on said modeling of said one or more parameters as random variables. The scheduler uses the feedback for generating an updated schedule.
    • 提供了一种将作业车间调度与制造设施的离散事件仿真相结合的方法和系统。 在一个方面,模拟器使用由调度器生成的作业调度来模拟设施的离散事件。 模拟器基于一个或多个本地规则,一个或多个资源以及与所述本地规则和所述资源相关联的一个或多个参数来模拟设备。 模拟器进一步将一个或多个参数模拟为随机变量,并在其设备的仿真中使用所述随机变量。 调度器基于模拟步骤的输出接收反馈。 所述反馈至少包括指令,所述调度器至少包括所述一个或多个资源中的至少一个,并且基于所述一个或多个参数的所述建模来将所述一个或多个参数改变为随机变量。 调度器使用反馈来生成更新的时间表。
    • 10. 发明申请
    • ANALYTICS FOR SETTING UP STRATEGIC INVENTORY SYSTEMS TO HANDLE SMALL LOT ORDERS IN THE STEEL INDUSTRY
    • 设立战略性库存系统以分析钢铁行业小批量的分析
    • US20110258087A1
    • 2011-10-20
    • US12760101
    • 2010-04-14
    • Soumyadip GhoshJayant R. Kalagnanam
    • Soumyadip GhoshJayant R. Kalagnanam
    • G06Q10/00G05B13/04G05B13/02
    • G06Q10/087G05B19/41865G05B2219/31319G05B2219/32323G06Q10/06315G06Q10/0875Y02P90/20
    • A method of managing manufacturing production includes determining a plurality of products for manufacture using a production line is disclosed. Each product is specified by composition and production line steps and criteria. Production orders for products are analyzed to determine whether products should be grouped into product-types, and whether product (type) should be made-to-stock or made to order. Queuing theory based analytic methods and optimization based heuristics are used to determine the priority for each product in the production line, taking product substitution opportunities in batch-production into account. Preselected points along the production line are determined for gathering an amount of inventory for each product. This decision is made considering product-differentiation down the line. An established inventory policy for each product at preselected points along the production line requires that inventory is reviewed and an order is placed for additional inventory when on hand inventory reaches a predetermined reorder point.
    • 管理制造生产的方法包括使用生产线确定用于制造的多个产品。 每个产品都由组合和生产线步骤和标准指定。 对产品的生产订单进行分析,以确定产品是否应分为产品类型,产品(类型)是否应进行库存订购或订购。 基于排队理论的分析方法和基于优化的启发式用于确定生产线中每种产品的优先级,考虑批量生产中的产品替代机会。 确定生产线上的预选点,以收集每个产品的库存量。 这个决定是考虑到产品差异化的。 在生产线上的预选点,每个产品的已建立的库存政策要求对库存进行审查,并在库存盘点达到预定的重新订购点时下订单。