    • Gas turbine installation
    • 燃气轮机安装
    • US06560957B2
    • 2003-05-13
    • US10095583
    • 2002-03-13
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C330
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and little change in design of a gas turbine. A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is included. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas as a heat source is also provided. With this configuration, there can be obtained an effect of reducing power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the amount of fuel used is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 本发明公开了一种燃气轮机发电系统,其能够在少量的供水量和燃气轮机的设计变化小的条件下实现高输出功率和高发电效率。 在空气压缩机(2)的上游侧的吸入空气室(22)中配置有微细的水滴喷射装置(11),以及将来自压缩机(2)供给的高压空气中的水分添加到水分添加装置 (2)。 还提供了一种用于通过使用燃气轮机废气作为热源来加热已经添加了水分的空气的再生器(5)。 利用这种结构,可以获得降低压缩机(2)的功率的效果以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少所使用的燃料量,所以发电效率提高。
    • 2. 发明申请
    • Gas turbine installation
    • 燃气轮机安装
    • US20070039307A1
    • 2007-02-22
    • US11503934
    • 2006-08-15
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C3/30F02C7/10
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and less change in design of a gas turbine. A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is disposed. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas as a heat source is also provided. With this configuration, there can be obtain an effect of reducing a power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the used amount of fuel is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 公开了一种燃气轮机发电系统,其能够在少量供水的条件下和燃气轮机的设计变化较小的情况下实现高输出功率和高发电效率。 在空气压缩机(2)的上游侧的吸入空气室(22)中配置有微细的水滴喷射装置(11),以及将来自压缩机(2)供给的高压空气中的水分添加到水分添加装置 (2)。 还提供了一种用于通过使用燃气轮机废气作为热源来加热已经添加了水分的空气的再生器(5)。 通过这种结构,可以获得降低压缩机(2)的功率的效果,以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少使用的燃料量,所以发电效率提高。
    • 3. 发明申请
    • Gas turbine installation
    • 燃气轮机安装
    • US20060032211A1
    • 2006-02-16
    • US11253829
    • 2005-10-20
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C7/10F02C3/30
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and less change in design of a gas turbine. A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is disposed. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas a heat source is also provided. With this configuration, there can be obtain an effect of reducing a power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the used amount of fuel is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 公开了一种燃气轮机发电系统,其能够在少量供水的条件下和燃气轮机的设计变化较小的情况下实现高输出功率和高发电效率。 在空气压缩机(2)的上游侧的吸入空气室(22)中配置有微细的水滴喷射装置(11),以及将来自压缩机(2)供给的高压空气中的水分添加到水分添加装置 (2)。 还提供一种用于通过使用燃气轮机废气加热加热了水分的空气的再生器(5)。 通过这种结构,可以获得降低压缩机(2)的功率的效果,以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少使用的燃料量,所以发电效率提高。
    • 4. 发明授权
    • Gas turbine installation
    • 燃气轮机安装
    • US06854259B2
    • 2005-02-15
    • US10670461
    • 2003-09-26
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C3/30F02C7/143F02C7/10
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and less change in design of a gas turbine.A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is disposed. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas as a heat source is also provided. With this configuration, there can be obtain an effect of reducing a power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the used amount of fuel is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 公开了一种燃气轮机发电系统,其能够在少量供水量和燃气轮机的设计变化较小的条件下实现高输出功率和高发电效率。微细水滴喷射装置(11)是 设置在空气压缩机(2)的上游侧的吸入空气室(22)中,并且设置有用于向从压缩机(2)供给的高压空气中添加水分的湿气添加装置(7)。 还提供了一种用于通过使用燃气轮机废气作为热源来加热已经添加了水分的空气的再生器(5)。 通过这种结构,可以获得降低压缩机(2)的功率的效果,以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少使用的燃料量,所以发电效率提高。
    • 6. 发明申请
    • Gas turbine installation
    • 燃气轮机安装
    • US20050011180A1
    • 2005-01-20
    • US10917286
    • 2004-08-13
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C3/30F02C7/143F02G1/00F25D3/02
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and less change in design of a gas turbine. A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is disposed. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas as a heat source is also provided. With this configuration, there can be obtain an effect of reducing a power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the used amount of fuel is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 公开了一种燃气轮机发电系统,其能够在少量供水的条件下和燃气轮机的设计变化较小的情况下实现高输出功率和高发电效率。 在空气压缩机(2)的上游侧的吸入空气室(22)中配置有微细的水滴喷射装置(11),以及将来自压缩机(2)供给的高压空气中的水分添加到水分添加装置 (2)。 还提供了一种用于通过使用燃气轮机废气作为热源来加热已经添加了水分的空气的再生器(5)。 通过这种结构,可以获得降低压缩机(2)的功率的效果,以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少使用的燃料量,所以发电效率提高。
    • 8. 发明授权
    • Gas turbine installation
    • 燃气轮机安装
    • US06973772B2
    • 2005-12-13
    • US10917286
    • 2004-08-13
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C3/30F02C7/143F02C7/10
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and less change in design of a gas turbine.A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is disposed. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas as a heat source is also provided. With this configuration, there can be obtain an effect of reducing a power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the used amount of fuel is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 公开了一种燃气轮机发电系统,其能够在少量供水的条件下和燃气轮机的设计变化较小的情况下实现高输出功率和高发电效率。 在空气压缩机(2)的上游侧的吸入空气室(22)中配置有微细的水滴喷射装置(11),以及将来自压缩机(2)供给的高压空气中的水分添加到水分添加装置 (2)。 还提供了一种用于通过使用燃气轮机废气作为热源来加热已经添加了水分的空气的再生器(5)。 通过这种结构,可以获得降低压缩机(2)的功率的效果,以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少使用的燃料量,所以发电效率提高。
    • 9. 发明授权
    • Gas turbine installation
    • 燃气轮机安装
    • US06637185B2
    • 2003-10-28
    • US10384519
    • 2003-03-11
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • Shigeo HatamiyaMasahiko YamagishiOsamu YokomizoYoshiki NoguchiMoriaki Tsukamoto
    • F02C330
    • F02C3/305F02C3/30F02C7/08F02C7/10F02C7/1435
    • Disclosed is a gas turbine power generating system capable of achieving a high output power and a high power generating efficiency under conditions with a small amount of supplied water and less change in design of a gas turbine. A fine water droplet spraying apparatus (11) is disposed in a suction air chamber (22) on the upstream side of an air compressor (2), and a moisture adding apparatus (7) for adding moisture to high pressure air supplied from the compressor (2) is included. A regenerator (5) for heating the air to which moisture has been added by using gas turbine exhaust gas as a heat source is also provided. With this configuration, there can be obtain an effect of reducing a power for the compressor (2) and an effect of increasing the output power due to addition of moisture to air (20) for combustion. Further, since the amount of fuel used is reduced by adopting a regenerating cycle, the power generating efficiency is improved.
    • 公开了一种燃气轮机发电系统,其能够在少量供水的条件下和燃气轮机的设计变化较小的情况下实现高输出功率和高发电效率。 在空气压缩机(2)的上游侧的吸入空气室(22)中配置有微细的水滴喷射装置(11),以及将来自压缩机(2)供给的高压空气中的水分添加到水分添加装置 (2)。 还提供了一种用于通过使用燃气轮机废气作为热源来加热已经添加了水分的空气的再生器(5)。 通过这种结构,可以获得降低压缩机(2)的功率的效果,以及由于向空气(20)中添加水分而增加输出功率的效果,用于燃烧。 此外,由于通过采用再生循环来减少所使用的燃料量,所以发电效率提高。