会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Hydrogen generation apparatus, fuel cell system, and hydrogen generation apparatus operation method
    • 氢发生装置,燃料电池系统和氢气发生装置的运行方法
    • US09252443B2
    • 2016-02-02
    • US13497730
    • 2010-12-24
    • Yukimune KaniHidenobu WakitaSeiji FujiharaTomoyuki Nakajima
    • Yukimune KaniHidenobu WakitaSeiji FujiharaTomoyuki Nakajima
    • H01M8/02H01M8/06C01B3/38
    • H01M8/0618C01B3/384C01B2203/0233C01B2203/0283C01B2203/044C01B2203/047C01B2203/066C01B2203/0811C01B2203/1258C01B2203/127C01B2203/148C01B2203/169Y02E60/50
    • A hydrogen generation apparatus (150) includes: a first desulfurizer (13) configured to remove, through adsorption, a sulfur compound in a raw material gas that is to be supplied to a reformer; a second desulfurizer (21) configured to hydrodesulfurize a sulfur compound in the raw material gas that is to be supplied to the reformer; a first passage (16) through which the raw material gas is supplied to the reformer through the first desulfurizer (13); a second passage (17) through which the raw material gas is supplied to the reformer through the second desulfurizer (21), without passing through the first desulfurizer (13); a switch configured to switch a passage through which the raw material gas flows between the first passage (16) and the second passage (17); and a controller. The controller controls the switch such that the raw material gas flows through the first passage (16) in at least one of a pressure compensation operation and a raw material gas purge operation, the pressure compensation operation being an operation of supplying the raw material gas in order to compensate for an internal pressure drop that occurs after an operation of generating a hydrogen-containing gas is stopped, and the raw material gas purge operation being an operation of purging the inside of the hydrogen generation apparatus with the raw material gas.
    • 氢气生成装置(150)包括:第一脱硫装置(13),被配置为通过吸附除去要供给至重整器的原料气体中的硫化合物; 第二脱硫剂(21),其构成为对要供给到所述重整器的原料气体中的硫化合物进行加氢脱硫; 第一通道(16),原料气体通过第一通道(16)通过第一脱硫器(13)供应至重整器; 第二通道(17),原料气体通过第二通道(17)通过第二脱硫器(21)供应至重整器,而不通过第一脱硫器(13); 开关,其构造成切换原料气体在第一通路(16)和第二通路(17)之间流过的通道; 和控制器。 控制器控制开关,使得原料气体以压力补偿操作和原料气体净化操作中的至少一种流过第一通道(16),压力补偿操作是将原料气体供应到 以补偿在停止生成含氢气体的操作之后发生的内部压降,原料气体净化操作是利用原料气体清洗氢气发生装置的内部的操作。
    • 7. 发明申请
    • HYDROGEN GENERATION APPARATUS, FUEL CELL SYSTEM, AND HYDROGEN GENERATION APPARATUS OPERATION METHOD
    • 氢气发生装置,燃料电池系统和氢气发生装置的运行方法
    • US20120178006A1
    • 2012-07-12
    • US13497730
    • 2010-12-24
    • Yukimune KaniHidenobu WakitaSeiji FujiharaTomoyuki Nakajima
    • Yukimune KaniHidenobu WakitaSeiji FujiharaTomoyuki Nakajima
    • H01M8/06B01J10/00
    • H01M8/0618C01B3/384C01B2203/0233C01B2203/0283C01B2203/044C01B2203/047C01B2203/066C01B2203/0811C01B2203/1258C01B2203/127C01B2203/148C01B2203/169Y02E60/50
    • A hydrogen generation apparatus (150) includes: a first desulfurizer (13) configured to remove, through adsorption, a sulfur compound in a raw material gas that is to be supplied to a reformer; a second desulfurizer (21) configured to hydrodesulfurize a sulfur compound in the raw material gas that is to be supplied to the reformer; a first passage (16) through which the raw material gas is supplied to the reformer through the first desulfurizer (13); a second passage (17) through which the raw material gas is supplied to the reformer through the second desulfurizer (21), without passing through the first desulfurizer (13); a switch configured to switch a passage through which the raw material gas flows between the first passage (16) and the second passage (17); and a controller. The controller controls the switch such that the raw material gas flows through the first passage (16) in at least one of a pressure compensation operation and a raw material gas purge operation, the pressure compensation operation being an operation of supplying the raw material gas in order to compensate for an internal pressure drop that occurs after an operation of generating a hydrogen-containing gas is stopped, and the raw material gas purge operation being an operation of purging the inside of the hydrogen generation apparatus with the raw material gas.
    • 氢气生成装置(150)包括:第一脱硫装置(13),被配置为通过吸附除去要供给至重整器的原料气体中的硫化合物; 第二脱硫剂(21),其构成为对要供给到所述重整器的原料气体中的硫化合物进行加氢脱硫; 第一通道(16),原料气体通过第一通道(16)通过第一脱硫器(13)供应至重整器; 第二通道(17),原料气体通过第二通道(17)通过第二脱硫器(21)供应至重整器,而不通过第一脱硫器(13); 开关,其构造成切换原料气体在第一通路(16)和第二通路(17)之间流过的通道; 和控制器。 控制器控制开关,使得原料气体以压力补偿操作和原料气体净化操作中的至少一种流过第一通道(16),压力补偿操作是将原料气体供应到 以补偿在停止生成含氢气体的操作之后发生的内部压降,原料气体净化操作是利用原料气体清洗氢气发生装置的内部的操作。