    • Soft Restarting of a Power Network Using Inverter-Controlled Energy Storage System
    • 使用逆变控制储能系统软电源重新启动电网
    • US20140049865A1
    • 2014-02-20
    • US13954101
    • 2013-07-30
    • Roger A. DougalAsif AnwarYucheng Zhang
    • Roger A. DougalAsif AnwarYucheng Zhang
    • H02H3/06
    • H02H3/06H02J9/062
    • Systems and methods for softly restarting a power network using an inverter-controlled energy storage system are provided. In response to an event such as a fault or other condition, a power network bus that provides power to one or more industrial loads (e.g. motors) can be disconnected from the utility grid. Instead of automatically recoupling the power network bus to the grid after a specified time period, a soft restart is accomplished by pre-energizing the power network bus with an energy storage system (ESS) according to a ramp up process and synchronizing the power network bus with the utility grid while the power network bus operates in an islanded mode. The power network bus can then be reconnected to the utility grid, for instance, by reclosing the one or more circuit breakers coupled between the power network bus and the utility grid.
    • 提供了使用逆变器控制的能量存储系统轻轻地重新启动电力网络的系统和方法。 响应于诸如故障或其他状况的事件,可以向公用电网断开向一个或多个工业负载(例如电动机)供电的电力网络总线。 代替在规定的时间段之后自动地将电力网络总线重新连接到电网,通过根据斜坡上升过程用能量存储系统(ESS)预充电电力网络总线来实现软重启动,并且使电力网络总线 在电力网络总线以孤岛模式运行时,使用公用电网。 然后,电力网络总线可以被重新连接到公用电网,例如,通过重新连接耦合在电力网络总线和公用电网之间的一个或多个断路器。
    • 4. 发明授权
    • Soft restarting of a power network using inverter-controlled energy storage system
    • 使用变频器控制的储能系统软电启动电网
    • US09190827B2
    • 2015-11-17
    • US13954101
    • 2013-07-30
    • Roger A. DougalAsif AnwarYucheng Zhang
    • Roger A. DougalAsif AnwarYucheng Zhang
    • H02H3/06H02J9/06
    • H02H3/06H02J9/062
    • Systems and methods for softly restarting a power network using an inverter-controlled energy storage system are provided. In response to an event such as a fault or other condition, a power network bus that provides power to one or more industrial loads (e.g. motors) can be disconnected from the utility grid. Instead of automatically recoupling the power network bus to the grid after a specified time period, a soft restart is accomplished by pre-energizing the power network bus with an energy storage system (ESS) according to a ramp up process and synchronizing the power network bus with the utility grid while the power network bus operates in an islanded mode. The power network bus can then be reconnected to the utility grid, for instance, by reclosing the one or more circuit breakers coupled between the power network bus and the utility grid.
    • 提供了使用逆变器控制的能量存储系统轻轻地重新启动电力网络的系统和方法。 响应于诸如故障或其他状况的事件,可以向公用电网断开向一个或多个工业负载(例如电动机)供电的电力网络总线。 代替在规定的时间段之后自动地将电力网络总线重新连接到电网,通过根据斜坡上升过程用能量存储系统(ESS)预充电电力网络总线来实现软重启动,并且使电力网络总线 在电力网络总线以孤岛模式运行时,使用公用电网。 然后,电力网络总线可以被重新连接到公用电网,例如,通过重新连接耦合在电力网络总线和公用电网之间的一个或多个断路器。