会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Quality control of authoring work flow within a benefits content system
    • 创意工作流程在质量内容体系中的质量控制
    • US08788311B2
    • 2014-07-22
    • US11107326
    • 2005-04-15
    • Karen FleurantRemo PolitanoJason Bennett
    • Karen FleurantRemo PolitanoJason Bennett
    • G06Q10/10G06Q10/06
    • G06Q10/10G06Q10/06316G06Q10/06395Y02P90/265
    • A first change request is generated in a work flow process to implement a first change to a portion of content within the benefits content system. A first status indicator, indicating whether the first change has passed a quality check, is associated with the first change request. A second status indicator, indicating whether the first status indicator should be overridden, is associated with the first change request. The first change request is moved to a next step in the work flow process if the associated first status indicator indicates the first change has passed the quality check. The first change request is moved to the next step in the work flow process if the associated first status indicator indicates the first change has failed the quality check and the associated second status indicator indicates that the first status indicator should be overridden.
    • 在工作流程过程中生成第一改变请求,以实现对益处内容系统内的一部分内容的第一改变。 指示第一次更改是否已通过质量检查的第一状态指示符与第一个更改请求相关联。 指示第一个状态指示符是否应被覆盖的第二个状态指示符与第一个更改请求相关联。 如果相关联的第一状态指示符指示第一个更改已通过质量检查,则第一个更改请求将移动到工作流程过程中的下一个步骤。 如果相关联的第一状态指示符指示质量检查的第一改变已经失败,并且相关联的第二状态指示符指示应该覆盖第一状态指示符,则将第一改变请求移动到工作流程过程中的下一步骤。
    • 4. 发明申请
    • Quality control of authoring work flow within a benefits content system
    • 创意工作流程在质量内容体系中的质量控制
    • US20060235737A1
    • 2006-10-19
    • US11107326
    • 2005-04-15
    • Karen FleurantRemo PolitanoJason Bennett
    • Karen FleurantRemo PolitanoJason Bennett
    • G05B19/418
    • G06Q10/10G06Q10/06316G06Q10/06395Y02P90/265
    • A first change request is generated in a work flow process to implement a first change to a portion of content within the benefits content system. A first status indicator, indicating whether the first change has passed a quality check, is associated with the first change request. A second status indicator, indicating whether the first status indicator should be overridden, is associated with the first change request. The first change request is moved to a next step in the work flow process if the associated first status indicator indicates the first change has passed the quality check. The first change request is moved to the next step in the work flow process if the associated first status indicator indicates the first change has failed the quality check and the associated second status indicator indicates that the first status indicator should be overridden.
    • 在工作流程过程中生成第一改变请求,以实现对益处内容系统内的一部分内容的第一改变。 指示第一次更改是否已通过质量检查的第一状态指示符与第一个更改请求相关联。 指示第一个状态指示符是否应被覆盖的第二个状态指示符与第一个更改请求相关联。 如果相关联的第一状态指示符指示第一个更改已通过质量检查,则第一个更改请求将移动到工作流程过程中的下一个步骤。 如果相关联的第一状态指示符指示质量检查的第一改变已经失败,并且相关联的第二状态指示符指示应该覆盖第一状态指示符,则将第一改变请求移动到工作流程过程中的下一步骤。
    • 5. 发明申请
    • Multi-authoring within benefits content system
    • 福利内容系统中的多创作
    • US20060235738A1
    • 2006-10-19
    • US11107416
    • 2005-04-15
    • Judy DoyleRemo PolitanoDoug Gifford
    • Judy DoyleRemo PolitanoDoug Gifford
    • G06F9/46
    • G06Q10/06311G06F17/30362G06Q10/063114
    • Described are methods and apparatus, including computer program products, for multi-authoring within a benefits content management the system. Relationships are defined between content elements of the benefits content system. A first request is received to change a first content element of the benefits content system. Other content elements of the benefits content system having a relationship to the first content element are identified. A user interface is provided on a computing device to enable a user associated with the first request to control access by other users attempting to change one or more of the other content elements having a relationship to the first element while the user associated with the first request is changing the first content element.
    • 描述的是方法和装置,包括计算机程序产品,用于在内容管理系统内进行多制作。 关系是在益处内容系统的内容元素之间定义的。 接收到第一请求以更改益处内容系统的第一内容元素。 识别具有与第一内容元素的关系的益处内容系统的其他内容元素。 在计算设备上提供用户界面,以使与第一请求相关联的用户能够控制其他用户尝试在与第一请求相关联的用户中改变与第一元素具有关系的一个或多个其他内容元素的访问 正在改变第一个内容元素。
    • 6. 发明授权
    • Multi-authoring within benefits content system
    • 福利内容系统中的多创作
    • US08265942B2
    • 2012-09-11
    • US11107416
    • 2005-04-15
    • Judy DoyleRemo PolitanoDoug Gifford
    • Judy DoyleRemo PolitanoDoug Gifford
    • G06Q99/00
    • G06Q10/06311G06F17/30362G06Q10/063114
    • Described are methods and apparatus, including computer program products, for multi-authoring within a benefits content management the system. Relationships are defined between content elements of the benefits content system. A first request is received to change a first content element of the benefits content system. Other content elements of the benefits content system having a relationship to the first content element are identified. A user interface is provided on a computing device to enable a user associated with the first request to control access by other users attempting to change one or more of the other content elements having a relationship to the first element while the user associated with the first request is changing the first content element.
    • 描述的是方法和装置,包括计算机程序产品,用于在内容管理系统内进行多制作。 关系是在益处内容系统的内容元素之间定义的。 接收到第一请求以更改益处内容系统的第一内容元素。 识别具有与第一内容元素的关系的益处内容系统的其他内容元素。 在计算设备上提供用户界面,以使与第一请求相关联的用户能够控制其他用户尝试在与第一请求相关联的用户中改变与第一元素具有关系的一个或多个其他内容元素的访问 正在改变第一个内容元素。