会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • Conveyor slat/support beam assembly for reciprocating slat conveyor
    • 用于往复式板条输送机的输送机板条/支撑梁组件
    • US20100025193A1
    • 2010-02-04
    • US12221159
    • 2008-07-30
    • Scott Michael DelamarterDaniel W. JacksonJames P. Drago
    • Scott Michael DelamarterDaniel W. JacksonJames P. Drago
    • B65G25/04
    • B65G25/065
    • Conveyor slats (14, 14′, 14″) are supported for longitudinal movement along support beams (12, 12′). The slats (14, 14′, 14″) are constructed from a structural plastic material and the support beams (12, 12′) are constructed from metal. The support beams (12, 12′) have a center portion in the form of an upwardly opening channel formed by side walls (22, 22′ and 24, 24′) and a bottom wall (20, 20′). A top is formed by side parts (16, 16′ and 18, 18′). Side parts (16, 16′) project laterally outwardly from the upper edges of the side walls (22, 22′). A top side part (18, 18′) projects laterally outwardly from the upper edges of the side walls (24, 24′). The conveyor slats (14, 14′, 14″) have a top wall (40, 40′, 40″), a pair of side walls (50, 50′, 50″ and 52, 52′, 52″). Inwardly projecting flanges (54, 54′, 54″ and 56, 56′, 56″) project laterally inwardly from the side walls (50, 50′, 50″ and 52, 52′, 52″). Outer side edges on the support beams (12, 12′) are positioned to contact shoulders on the flanges (54, 54′, 54″ and 56, 56′, 56″) to prevent unwanted upward movement of the slats (14, 14′, 14″) off from the beams (12, 12′).
    • 输送板条(14,14',14“)被支撑以沿着支撑梁(12,12')纵向移动。 板条(14,14',14“)由结构塑料材料构成,支撑梁(12,12')由金属构成。 支撑梁(12,12')具有由侧壁(22,22'和24,24')和底壁(20,20')形成的向上开口通道形式的中心部分。 顶部由侧部(16,16'和18,18')形成。 侧面部分(16,16')从侧壁(22,22')的上边缘横向向外突出。 顶侧部分(18,18')从侧壁(24,24')的上边缘横向向外突出。 输送带条(14,14',14“)具有顶壁(40,40',40”),一对侧壁(50,50',50“和52,52',52” ')。 向内突出的凸缘(54,54',54“和56,56',56”)从侧壁(50,50',50“和52,52',52”)横向向内突出。 支撑梁(12,12')上的外侧边缘定位成接触凸缘(54,54',54“和56,56',56”)上的肩部,以防止板条(14)的不必要的向上运动 ,14',14“)离开梁(12,12')。