会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Valuing and optimizing scheduling of generation assets for a group of facilities
    • 评估和优化一组设施的发电资产调度
    • US07389209B2
    • 2008-06-17
    • US10336542
    • 2003-01-02
    • Ralph D. MasielloMihaela ManoliuPetter Skantze
    • Ralph D. MasielloMihaela ManoliuPetter Skantze
    • G06F7/60G06F17/10G06F17/00G06F17/50
    • G06Q10/06G06Q10/0631H02J3/008Y02E40/76Y04S10/54Y04S10/545Y04S50/10Y10S706/927
    • The present invention provides methods and systems for determining anticipated profit from facilities such as electrical power generation facilities, for determining values for assets based on profitability of facilities, and for determining optimal operational scheduling options for facilities. Methods and systems are provided which utilize a dynamic programming algorithm and a decision tree based model in which one or more operating constraints are implicitly modeled, facilitating computational tractability. Additionally, methods and systems are provided that utilize a dynamic programming algorithm and a decision tree based model that accounts for a combined effect of price paths with specified uncertainty as well as operational constraints. Furthermore, methods and systems are provided that address profitability, valuation, and scheduling in relation to a group, or portfolio, of facilities, accounting for liquidity factors as well as group, or global, constraints.
    • 本发明提供了用于确定诸如发电设施的设施的预期利润的方法和系统,用于基于设施的利润率确定资产价值,以及确定设施的最佳运营调度选项。 提供了使用动态规划算法和基于决策树的模型的方法和系统,其中一个或多个操作约束被隐含地建模,从而促进计算易处理性。 此外,提供了利用动态规划算法和基于决策树的模型的方法和系统,其考虑了具有特定不确定性的价格路径以及操作约束的组合效应。 此外,提供了方法和系统,以解决与集团或投资组合相关的设施的盈利能力,估值和调度,考虑流动性因素以及集团或全球约束。
    • 2. 发明授权
    • Valuing and optimizing scheduling of generation assets
    • 评估和优化发电资产调度
    • US07474995B2
    • 2009-01-06
    • US10336541
    • 2003-01-02
    • Ralph D. MasielloMihaela ManoliuPetter Skantze
    • Ralph D. MasielloMihaela ManoliuPetter Skantze
    • G06F17/10G06F17/50
    • H02J3/008G06Q10/06G06Q10/0631G06Q50/06Y02E40/76Y04S10/54Y04S10/545Y04S50/10
    • The present invention provides methods and systems for determining anticipated profit from facilities such as electrical power generation facilities, for determining values for assets based on profitability of facilities, and for determining optimal operational scheduling options for facilities. Methods and systems are provided which utilize a dynamic programming algorithm and a decision tree based model in which one or more operating constraints are implicitly modeled, facilitating computational tractability. Additionally, methods and systems are provided that utilize a dynamic programming algorithm and a decision tree based model that accounts for a combined effect of price paths with specified uncertainty as well as operational constraints. Furthermore, methods and systems are provided that address profitability, valuation, and scheduling in relation to a group, or portfolio, of facilities, accounting for liquidity factors as well as group, or global, constraints.
    • 本发明提供了用于确定诸如发电设施的设施的预期利润的方法和系统,用于基于设施的利润率确定资产价值,以及确定设施的最佳运营调度选项。 提供了使用动态规划算法和基于决策树的模型的方法和系统,其中一个或多个操作约束被隐含地建模,从而促进计算易处理性。 此外,提供了利用动态规划算法和基于决策树的模型的方法和系统,其考虑了具有特定不确定性的价格路径以及操作约束的组合效应。 此外,提供了方法和系统,以解决与集团或投资组合相关的设施的盈利能力,估值和调度,考虑流动性因素以及集团或全球约束。