会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • INFORMATION PROCESSING DEVICE, POWER-DEMANDING OBJECT, INFORMATION PROCESSING METHOD, AND NON-TRANSITORY STORAGE MEDIUM
    • 信息处理设备,功率需求对象,信息处理方法和非存储存储介质
    • US20160291557A1
    • 2016-10-06
    • US15031468
    • 2014-09-29
    • NEC CORPORATION
    • Ryo HASHIMOTOHitoshi YANOHisato SAKUMAKoji KUDOEisuke SANEYOSHITakahiro TOIZUMIKosuke HOMMAYuma IWASAKI
    • G05B19/042
    • G06Q10/06314G05B15/02G05B2219/2639G06Q50/06H02J3/00H02J2003/003Y04S10/126Y04S10/54
    • A time range setting unit (110) sets an operation startable time point at which an operation can be started and a target operation end time point which is the latest time point among time points at which the operation is to be ended, with respect to each of plural power demanding objects (20). A necessary operation time setting unit (120) sets a necessary operation time with respect to each of the plural power demanding objects (20). A shape information acquisition unit (130) acquires shape information from a schedule management device (40). The shape information indicates an assumed shape of a transition line that represents transition in the amount of supplied power in a target period. A demand transition setting unit (140) sets power demand transition information indicating transition in an electric energy demand in the target period so that the necessary operation time is obtained and so that the transition in the electric energy demand generated by the plural power demanding objects (20) being operated accords with the assumed shape.
    • 时间范围设定单元(110)对于每个操作,设定可以开始操作的操作开始时间点和作为操作结束的时间点之间的最后时间点的目标操作结束时间点 的多个需要电力的物体(20)。 一个必要的操作时间设定单元(120)针对多个功率要求物体(20)中的每一个设定必要的操作时间。 形状信息获取单元(130)从日程管理装置(40)获取形状信息。 形状信息表示表示目标周期内的供给量的变化的过渡线的假定形状。 需求转换设定单元(140)在目标周期内设定表示电力需求中的转移的电力需求转移信息,从而获得必要的运行时间,并且使得由多个电力需求对象产生的电力需求的转变 20)被操作符合假定的形状。