会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • Kit and Method for the Detection of Anti-Hepatitis C Virus (Hcv) Antibodies
    • 用于检测抗丙型肝炎病毒(Hcv)抗体的试剂盒和方法
    • US20080193955A1
    • 2008-08-14
    • US11883499
    • 2005-05-10
    • Peng Cui
    • Peng Cui
    • G01N33/00
    • G01N33/56983
    • The present invention provides a kit for the detection of anti-hepatitis C virus (HCV) antibodies using a double-antigen sandwich technique, said kit carries out the detection by the process ‘solid support-first antigen-HCV antibody to be detected-second antigen-enzyme linked substance-recognizable signal’, wherein one or more coupling reactions between the second antigen and the enzyme linked substance occur, and the diluent for the second antigen and that for the enzyme linked substance are respectively placed into two container, they are added in order in two steps to reaction system and incubated respectively. The present invention can solve the following problems encountered by prior art: 1) the influence of the enzyme linked substance on the activity of the second antigen; 2) the mismatch of disulfide bonds in second antigen, thereby enhance the activity of the second antigen and obviate loss of enzyme activity, therefore, the present kit highly improves the sensitivity and specificity of the detection.
    • 本发明提供了使用双抗原夹心技术检测抗丙型肝炎病毒(HCV)抗体的试剂盒,所述试剂盒通过方法进行检测,其中所述方法是待检测的固体支持物 - 第一抗原HCV抗体 - 秒 抗原酶连接物质可识别信号“,其中发生第二抗原和酶连接物质之间的一个或多个偶联反应,将第二抗原和酶连接物质的稀释剂分别置于两个容器中,它们是 分两步加入反应体系中分别孵育。 本发明可以解决现有技术遇到的以下问题:1)酶连接物质对第二抗原活性的影响; 2)第二抗原中二硫键的错配,从而增强第二抗原的活性,消除酶活性的丧失,因此,本试剂盒大大提高了检测的灵敏度和特异性。
    • 4. 发明申请
    • DEBRIS FLOW DRAINAGE CANAL BASED ON CASCADE ANTISCOUR NOTCHED SILL GROUP AND APPLICATION THEREOF
    • 基于CASCADE抗锯齿花纹组的DEBRIS流动排水沟槽及其应用
    • US20130078037A1
    • 2013-03-28
    • US13702466
    • 2011-06-10
    • Xiaoqing ChenPeng CuiYong YouDeji Li
    • Xiaoqing ChenPeng CuiYong YouDeji Li
    • E02B5/08
    • E02B5/085E02B3/04E03F3/046
    • A system of debris-flow drainage canal with cascaded sills is provided, which allows a high-efficient and low-cost realization of debris flow drainage and scour prevention. The canal contains two converging walls and a series of scour prevention sills, which are laid between the two converging walls. The sills are embedded to a certain depth and are evenly spaced and symmetrical to the centre line of the canal to form a cascaded structure for scour prevention. The drainage canal's width is 2 times wider than the sill's horizontal length along the cross-section. Compared with the prior art, this system can drain off a wide variety of flows from debris flow to flood and prevent debris-flow siltation even on a gentle slope. This system has a much higher stability and longer life of service. Moreover, this system can maintain the aquatic habitat in gullies and contribute to ecological restoration.
    • 提供了一种具有级联门槛的泥石流排水系统,实现了高效,低成本地实现泥石流排水和防潮。 运河包含两个会聚壁和一系列防冲击的窗台,铺设在两个会聚墙之间。 门槛被嵌入一定的深度,并且与管道的中心线均匀间隔和对称,以形成用于防止冲刷的级联结构。 排水渠的宽度是沿横截面宽度大于门槛水平长度的2倍。 与现有技术相比,该系统可以排除泥石流泛滥的各种流量,甚至在平缓的斜坡上防止泥石流淤积。 该系统具有更高的稳定性和更长的使用寿命。 此外,该系统可以保持沟渠中的水生栖息地,有助于生态恢复。
    • 5. 发明授权
    • Environmentally friendly chlorine-free deicing composition
    • 环保无氯除冰组合物
    • US08366957B2
    • 2013-02-05
    • US13253469
    • 2011-10-05
    • Dehui WangDayong WeiYuanyuan LinPeng Cui
    • Dehui WangDayong WeiYuanyuan LinPeng Cui
    • C09K3/18
    • C09K3/185
    • The present application relates to a deicing composition, specifically to a chlorine-free deicing composition, comprising at least two active ingredients selected from glycerol, a glycol-type compound and a salt of an organic acid. The deicing compositions of the present invention contain no chlorine-containing material, are relatively less corrosive to concrete and carbon steels, and have no toxic effect on plants. Moreover, the deicing compositions of the present invention have high deicing efficiency, which is, according to the Chinese national standard GB/T23851-2009, up to 200% of the efficiency of sodium chloride or more. In addition, the deicing compositions of the present invention maintain a long-lasting deicing effect (e.g., a deicing effect for up to 3 hours).
    • 本申请涉及除冰组合物,具体涉及无氯除冰组合物,其包含至少两种选自甘油,二醇型化合物和有机酸盐的活性成分。 本发明的除冰组合物不含有含氯材料,对混凝土和碳钢的腐蚀性相对较低,对植物没有毒性作用。 此外,本发明的除冰组合物除冰效果好,按GB / T23851-2009中国国家标准,高达氯化钠效率的200%以上。 此外,本发明的除冰组合物保持持久的除冰效果(例如,除冰效果长达3小时)。
    • 7. 发明授权
    • Debris-flow prevention method by controlling debris-flow magnitude and avoiding to block main river
    • 通过控制泥石流量大小避免堵塞主要河流的泥石流防治方法
    • US08517633B2
    • 2013-08-27
    • US13319922
    • 2011-01-25
    • Peng CuiXiaoqing ChenYong YouDeji LiKai Huang
    • Peng CuiXiaoqing ChenYong YouDeji LiKai Huang
    • F17D3/00
    • E02B3/023E02B3/02E02B3/026Y02A10/28Y10T137/0318
    • The invention discloses a debris-flow prevention method by controlling debris-flow magnitude and avoiding to block main river. This method first adopts the drainage works for delivering debris flow in corporation with the transport of the main river; if the drained sediment cannot be transported by the main river, the blocking works are adopted; and if the sediment still exceeds the delivering capacity, the deposit stopping works are adopted. Compared with the prior art, this invention makes full use of the main river's transport capacity, gives priority to dredging and also reasonably distributes the sediment and deploys the engineering system, so as to realize the safe discharge of debris flow, and avoid the secondary disaster of “barrier lake” caused by the blocking of main river due to excessive discharge of debris flow and fully guarantee the safety of mountain towns, major projects and infrastructure located at the mouth of debris flow gully.
    • 本发明公开了一种通过控制泥石流量大小避免堵塞主要河流的泥石流防治方法。 该方法首先采用排水工程,与主河运输同时输送泥石流; 如果主河不能运输排水沉积物,采用封堵工程; 如果沉积物仍然超过交付能力,则采用停堆工程。 与现有技术相比,本发明充分利用了主要河流的运输能力,优先挖泥,合理分配沉积物和部署工程系统,实现泥石流安全排放,避免二次灾害 由于泥石流过度流失导致的主要河流堵塞造成的“障碍湖”,充分保障了位于泥石流沟口的山区镇,重大项目和基础设施的安全。
    • 8. 发明申请
    • CABLE MANAGEMENT PANEL
    • 电缆管理面板
    • US20110317971A1
    • 2011-12-29
    • US12992480
    • 2009-05-12
    • Li ZhangZong-sheng LengPeng CuiThomas Chan
    • Li ZhangZong-sheng LengPeng CuiThomas Chan
    • G02B6/44
    • H04Q1/06H04Q1/023
    • A cable management panel having a chassis and a sliding drawer. The drawer having a cable storage region, a cable splice region, and a cable termination region. The cable management panel including cable guides that define an incoming cable pathway to the cable storage region, and then to the cable splice region; an intermediate cable pathway to the cable termination region, and an outgoing cable pathway. The outgoing cable pathway having an S-curved cable routing configuration when the sliding drawer is closed. The chassis of the cable management panel defining an interior sized for receipt of one two-rack-unit drawer, or in the alternative, two one-rack-unit drawers.
    • 具有底盘和滑动抽屉的电缆管理面板。 抽屉具有电缆存储区域,电缆接头区域和电缆终端区域。 电缆管理面板包括电缆引导件,其定义到电缆存储区域的输入电缆路径,然后到电缆接合区域; 到电缆终端区域的中间电缆路径,以及输出电缆路径。 当滑动抽屉关闭时,输出电缆通道具有S形弯曲电缆布线配置。 电缆管理面板的机箱定义了一个内部尺寸,用于接收一个双机架单元抽屉,或者替代地,两个单机架单元抽屉。
    • 10. 发明申请
    • DEBRIS-FLOW PREVENTION METHOD BY CONTROLLING DEBRIS-FLOW MAGNITUDE AND AVOIDING TO BLOCK MAIN RIVER
    • 通过控制流动流量并防止主坝流失预防方法
    • US20120273046A1
    • 2012-11-01
    • US13319922
    • 2011-01-25
    • Peng CuiXiaoqing ChenYong YouDeji LiKai Huang
    • Peng CuiXiaoqing ChenYong YouDeji LiKai Huang
    • F17D3/00
    • E02B3/023E02B3/02E02B3/026Y02A10/28Y10T137/0318
    • The invention discloses a debris-flow prevention method by controlling debris-flow magnitude and avoiding to block main river. This method first adopts the drainage works for delivering debris flow in corporation with the transport of the main river; if the drained sediment cannot be transported by the main river, the blocking works are adopted; and if the sediment still exceeds the delivering capacity, the deposit stopping works are adopted. Compared with the prior art, this invention makes full use of the main river's transport capacity, gives priority to dredging and also reasonably distributes the sediment and deploys the engineering system, so as to realize the safe discharge of debris flow, and avoid the secondary disaster of “barrier lake” caused by the blocking of main river due to excessive discharge of debris flow and fully guarantee the safety of mountain towns, major projects and infrastructure located at the mouth of debris flow gully.
    • 本发明公开了一种通过控制泥石流量大小避免堵塞主要河流的泥石流防治方法。 该方法首先采用排水工程,与主河运输同时输送泥石流; 如果主河不能运输排水沉积物,采用封堵工程; 如果沉积物仍然超过交付能力,则采用停堆工程。 与现有技术相比,本发明充分利用了主要河流的运输能力,优先挖泥,合理分配沉积物和部署工程系统,实现泥石流安全排放,避免二次灾害 由于泥石流过度流失导致的主要河流堵塞造成的障碍湖,充分保证了山体城镇,位于泥石流沟口的重大项目和基础设施的安全。