会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Methods for configuring tubing for interconnecting in-series multiple liquid-cooled cold plates
    • 用于配置串联多个液冷冷板的管道的方法
    • US07751918B2
    • 2010-07-06
    • US11620088
    • 2007-01-05
    • Levi A. CampbellJohn L. ColbertMichael J. Ellsworth, Jr.Arvind K. Sinha
    • Levi A. CampbellJohn L. ColbertMichael J. Ellsworth, Jr.Arvind K. Sinha
    • G06F19/00F25B7/00H01G4/002H02B1/00
    • H05K7/20809G06F1/20
    • Methods of configuring a cooling subassembly for an electronics system are provided, that is, for establishing a coolant-carrying tube layout for interconnecting multiple liquid-cooled cold plates in series-fluid communication for cooling multiple heat-generating electronic components of an electronics system. The electronic components are to be plugged in fixed relation into a preconfigured motherboard, and the tube layout includes at least one rigid coolant-carrying tube. Simplified analysis is initially performed to evaluate stress on the rigid tube(s) and determine if loss of actuation load on the electronic components exceeds an acceptable threshold, and if so, at least one tube having high stress is identified and reconfigured. Thereafter, analysis is performed to determine whether, with available actuation load on the cooling subassembly, electrical connection loading between the electronic components and the supporting motherboard is above an acceptable minimum level. If so, the coolant-carrying tube layout is chosen as a final design.
    • 提供了构造用于电子系统的冷却子组件的方法,即,用于建立冷却剂承载管布局,用于将串联流体通信中的多个液冷冷板互连,以冷却电子系统的多个发热电子部件。 电子部件将以固定关系插入到预配置的主板中,并且管布置包括至少一个刚性的冷却剂输送管。 最初进行简化分析以评估刚性管上的应力,并确定电子部件上的致动负载的损失是否超过可接受的阈值,如果是,则识别和重新配置至少一个具有高应力的管。 此后,执行分析以确定在冷却子组件上的可用致动负载下,电子部件和支撑母板之间的电连接负载是否高于可接受的最低水平。 如果是这样,选择冷却剂载体管布局作为最终设计。