会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • Information management device, information management system, and computer usable medium
    • 信息管理装置,信息管理系统和计算机可用介质
    • US20070081470A1
    • 2007-04-12
    • US11528343
    • 2006-09-28
    • Satoru YanagiKazushige MuroiKazuma Aoki
    • Satoru YanagiKazushige MuroiKazuma Aoki
    • H04J1/16
    • H04L41/064G11B20/00086
    • The same utilization data specifying information as utilization data specifying information for specifying one utilization data is extracted from a first storage unit (first extraction). Process specifying information correlated with the extracted utilization data specifying information is selectively extracted every type of a processing operation (second extraction). The same process specifying information as the process specifying information extracted in the second extraction is extracted from the first storage unit in the unit of type of a processing operation (third extraction). When a utilization time correlated with the process specifying information extracted in the third extraction is included in a predetermined time before and after a utilization time correlated with the process specifying information extracted in the second extraction, the utilization data specified by the utilization specifying information correlated with the process specifying information extracted in the third extraction is correlated with the one utilization data.
    • 从第一存储单元(第一提取)提取与用于指定一个利用数据的使用数据指定信息相同的使用数据指定信息。 每种处理操作(第二次提取)选择性地提取与所提取的利用数据指定信息相关的处理指定信息。 以处理操作的类型(第三提取)从第一存储单元提取与第二提取中提取的处理指定信息相同的处理指定信息。 当与在第三提取中提取的处理指定信息相关联的利用时间被包括在与在第二提取中提取的处理指定信息相关的使用时间之前和之后的预定时间内时,由使用指定信息指定的利用数据与 在第三提取中提取的处理指定信息与一个利用数据相关联。
    • 9. 发明申请
    • Information management system, information processing device, and program
    • 信息管理系统,信息处理设备和程序
    • US20070032887A1
    • 2007-02-08
    • US11492787
    • 2006-07-26
    • Kazushige MuroiSatoru YanagiSatoshi WatanabeKazuma Aoki
    • Kazushige MuroiSatoru YanagiSatoshi WatanabeKazuma Aoki
    • G06T1/00G06F13/00G06F13/372G09G1/02G05B11/01G05B19/42G05B13/02
    • G06Q10/06
    • In an information management system comprising: an external apparatus having a function executing unit which includes input unit; and an information processing apparatus connected to the external apparatus, when another reading process operation different from one reading process operation executed by the input unit is specified, a specific time specified by one time instant contained in a time period corresponding to the execution of the one reading process operation and another time instant corresponding to the execution of another reading process operation, and a predetermined condition time are compared with each other; and in the case that the specific time is shorter than or equal to the condition time, a relationship is applied to both data obtained by the above-described one reading process operation and data obtained by the above-described another reading process operation, while it is so assumed that these data are related to each other.
    • 一种信息管理系统,包括:外部设备,具有包括输入单元的功能执行单元; 以及连接到外部设备的信息处理设备,当指定与由所述输入单元执行的一个读取处理操作不同的另一读取处理操作时,包含在与所述外部设备的执行相对应的时间段中的一个时刻所指定的特定时间 读取处理操作和对应于另一读取处理操作的执行的另一个时刻,并且将预定条件时间彼此进行比较; 并且在特定时间短于或等于条件时间的情况下,对通过上述一次读取处理操作获得的数据和通过上述另一读取处理操作获得的数据两者进行关系,同时 假设这些数据是相互关联的。