会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • COUNTERWEIGHT ARRANGEMENT FOR AN ELEVATOR AND AN ELEVATOR
    • 电梯和电梯的相对安排
    • US20140284148A1
    • 2014-09-25
    • US14193986
    • 2014-02-28
    • KONE Corporation
    • Razvan ALBUErno LEHIKOINENNiko Forsström
    • B66B17/12
    • B66B17/12
    • A counterweight arrangement for an elevator, includes a first vertical guide rail and a second vertical guide rail, the guide rails defining a vertical guide rail plane, a counterweight arranged to travel between the guide rails guided by the guide rails, the counterweight including a frame, which includes a first upright beam and a second upright beam and a cross beam connecting the upper ends of the upright beams, and a diverting pulley mounted between the guide rails on the cross beam of the counterweight frame, the pulley having a vertical plane of rotation, which crosses the guide rail plane. The cross beam is aligned parallel with the plane of rotation of the pulley. An elevator includes the aforementioned counterweight arrangement.
    • 一种用于电梯的配重装置,包括第一垂直导轨和第二垂直导轨,所述导轨限定垂直导轨平面,所述导轨布置成在由导轨引导的导轨之间行进,配重包括框架 ,其包括第一直立梁和第二直立梁以及连接直立梁的上端的横梁以及安装在配重框架的横梁上的导轨之间的转向滑轮,滑轮具有垂直平面 旋转,其穿过导轨平面。 横梁与滑轮的旋转平面平行。 电梯包括上述配重装置。
    • 2. 发明授权
    • Counterweight arrangement for an elevator and an elevator
    • 电梯和电梯的配重配置
    • US09561937B2
    • 2017-02-07
    • US14193986
    • 2014-02-28
    • KONE Corporation
    • Razvan AlbuErno LehikoinenNiko Forsström
    • B66B17/12B66B11/08
    • B66B17/12
    • A counterweight arrangement for an elevator, includes a first vertical guide rail and a second vertical guide rail, the guide rails defining a vertical guide rail plane, a counterweight arranged to travel between the guide rails guided by the guide rails, the counterweight including a frame, which includes a first upright beam and a second upright beam and a cross beam connecting the upper ends of the upright beams, and a diverting pulley mounted between the guide rails on the cross beam of the counterweight frame, the pulley having a vertical plane of rotation, which crosses the guide rail plane. The cross beam is aligned parallel with the plane of rotation of the pulley. An elevator includes the aforementioned counterweight arrangement.
    • 一种用于电梯的配重装置,包括第一垂直导轨和第二垂直导轨,所述导轨限定垂直导轨平面,所述导轨布置成在由导轨引导的导轨之间行进,配重包括框架 ,其包括第一直立梁和第二直立梁以及连接直立梁的上端的横梁以及安装在配重框架的横梁上的导轨之间的转向滑轮,滑轮具有垂直平面 旋转,其穿过导轨平面。 横梁与滑轮的旋转平面平行。 电梯包括上述配重装置。
    • 3. 发明授权
    • Method for installing the hoisting roping of an elevator
    • 安装升降机起吊绳的方法
    • US08943695B2
    • 2015-02-03
    • US13667573
    • 2012-11-02
    • Kone Corporation
    • Niko ForsströmOsmo BjörniJarmo Ahoniemi
    • B66B19/00B66B19/02
    • B66B19/02B66B19/007Y10T29/49455Y10T29/49616Y10T29/49716Y10T29/49826
    • Method for installing the hoisting roping of an elevator, wherein the first elevator unit to be moved is disposed at a suitable point in the elevator hoistway, and the second elevator unit to be moved is disposed at a suitable point in the elevator hoistway, which first elevator unit is an elevator car and which second elevator unit is a counterweight, or vice versa. The first and/or second section of the hoisting roping is connected to its elevator unit via a diverting pulley system such that when the diverting pulley system is still separate from the elevator unit, the section in question of the hoisting roping is arranged to travel under the diverting pulley system of its elevator unit, and the diverting pulley system is lowered, when reeved, downwards into the proximity of its elevator unit, after which the diverting pulley system in question is fixed to its elevator unit.
    • 一种用于安装电梯提升绳索的方法,其中待移动的第一电梯单元设置在电梯井道中的适当位置,并且待移动的第二电梯单元设置在电梯井道中的适当位置, 电梯单元是电梯轿厢,第二电梯单元是配重,反之亦然。 提升绳索的第一和/或第二部分经由转向滑轮系统连接到其电梯单元,使得当转向滑轮系统仍然与电梯单元分离时,提升绳索的所述部分被布置成在 其升降机单元的转向滑轮系统和转向滑轮系统在被固定时向下倾斜到其升降机单元附近,之后将所述转向滑轮系统固定到其升降机单元。