    • 1. 发明申请
    • Marine Pipeline Installation System and Methods
    • 船用管道安装系统及方法
    • US20100232884A1
    • 2010-09-16
    • US12225365
    • 2006-03-22
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus WijningTerence Willem August Vehmeijer
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus WijningTerence Willem August Vehmeijer
    • F16L1/15
    • F16L1/15B63B35/03F16L1/19F16L1/203F16L1/23
    • A marine pipeline installation system for laying an offshore pipeline and/or installing a subsea riser, the system at least allowing to carry out the reel lay method, wherein the system comprises:one or more storage reels for storage of pipeline, a pipeline launch tower adapted for launching the pipeline in the direction of the sea, a pipeline guide at an elevated position for guiding said pipeline to a pipeline launch trajectory along said tower, one or more tensioners, each tensioner comprising a tensioner frame and multiple tracks supported by said tensioner frame, said tracks being adapted for engaging the pipeline and supporting at least part of the weight of the launched pipeline, the tensioner frame being supported by said tower via an associated support assembly. The support assembly of at least one tensioner frame, preferably of all tensioner frames, is adapted to allow for displacement of the tensioner frame between an active position, wherein the pipeline launch trajectory extends through the tensioner frame between the tracks, so that the tracks can engage on a pipeline, and a retracted and non-operable position.
    • 一种用于铺设海上管道和/或安装海底立管的船用管道安装系统,该系统至少允许执行卷筒铺设方法,其中该系统包括:用于储存管道的一个或多个存储卷轴,管道发射塔 适于沿海的方向发射管道,在升高位置处的导管,用于将所述管道引导到沿着塔的管道发射轨迹,一个或多个张紧器,每个张紧器包括张紧器框架和由所述张紧器支撑的多个轨道 框架,所述轨道适于接合管道并且支撑所推出的管道的重量的至少一部分,所述张紧器框架由所述塔架经由相关联的支撑组件支撑。 至少一个张紧器框架的支撑组件,优选地是所有张紧器框架,适于允许张紧器框架在活动位置之间移动,其中管道发射轨迹延伸穿过轨道之间的张紧器框架,使得轨道可以 接合管道,以及缩回和不可操作的位置。
    • 3. 发明授权
    • Marine pipeline installation system and methods
    • 船用管道安装系统及方法
    • US07938598B2
    • 2011-05-10
    • US12225365
    • 2006-03-22
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus WijningTerence Willem August Vehmeijer
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus WijningTerence Willem August Vehmeijer
    • F16L1/15F16L1/23
    • F16L1/15B63B35/03F16L1/19F16L1/203F16L1/23
    • A marine pipeline installation system for laying an offshore pipeline and/or installing a subsea riser, the system at least allowing to carry out the reel lay method, wherein the system comprises: one or more storage reels for storage of pipeline, a pipeline launch tower adapted for launching the pipeline in the direction of the sea, a pipeline guide at an elevated position for guiding said pipeline to a pipeline launch trajectory along said tower, one or more tensioners, each tensioner comprising a tensioner frame and multiple tracks supported by said tensioner frame, said tracks being adapted for engaging the pipeline and supporting at least part of the weight of the launched pipeline, the tensioner frame being supported by said tower via an associated support assembly. The support assembly of at least one tensioner frame, preferably of all tensioner frames, is adapted to allow for displacement of the tensioner frame between an active position, wherein the pipeline launch trajectory extends through the tensioner frame between the tracks, so that the tracks can engage on a pipeline, and a retracted and non-operable position.
    • 一种用于铺设海上管道和/或安装海底立管的船用管道安装系统,该系统至少允许执行卷筒铺设方法,其中该系统包括:用于储存管道的一个或多个存储卷轴,管道发射塔 适于沿海的方向发射管道,在升高位置处的导管,用于将所述管道引导到沿着塔的管道发射轨迹,一个或多个张紧器,每个张紧器包括张紧器框架和由所述张紧器支撑的多个轨道 框架,所述轨道适于接合管道并且支撑所推出的管道的重量的至少一部分,所述张紧器框架由所述塔架经由相关联的支撑组件支撑。 至少一个张紧器框架的支撑组件,优选地是所有张紧器框架,适于允许张紧器框架在活动位置之间移动,其中管道发射轨迹延伸穿过轨道之间的张紧器框架,使得轨道可以 接合管道,以及缩回和不可操作的位置。
    • 5. 发明授权
    • Marine pipelaying system and method for installing an offshore pipeline that includes one or more accessories
    • 海上管道铺设系统和安装包括一个或多个附件的海上管道的方法
    • US07955028B2
    • 2011-06-07
    • US11883850
    • 2005-02-08
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus Wijning
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus Wijning
    • F16L1/14
    • F16L1/19F16L1/14F16L1/207F16L1/23
    • Marine pipelaying method and system for installing an offshore pipeline (1) that includes one or more accessories (10). The method includes the steps of providing a vessel (2), launching the pipeline (1) in a firing line from the vessel (2) in the direction of the seabed, engaging the pipeline (1) with a clamping device (5b) that is connected to the vessel (2) and adapted to support the weight of the previously launched pipeline (1), and moving the accessory (10) into the firing line to a position above the clamping device (5b). Then the accessory (10) is connected to the pipeline (1) above the clamping (5b) device while the pipeline (1) is held by the clamping device (5b) Follow that the accessory (10) and the launched pipeline (1) connected thereto and releasably secured to a controlled load hoisting device (5) and the weight of the accessory (10) and the launched pipeline (1) connected thereto are transferred from the clamping device (5b) to the controlled load hoisting device (5) while the accessory (10) and the launched pipeline (1) connected thereto remain in the firing line. Finally the clamping device (5b) is disengaged from the pipeline (1) and moved away from firing line. Then the accessory (10) and the launched pipeline (1) connected thereto are lowered along the firing line by the controlled load hoisting device (5).
    • 用于安装包括一个或多个附件(10)的海上管道(1)的海上管道铺设方法和系统。 该方法包括以下步骤:提供容器(2),在管线(1)上沿着海底方向从容器(2)沿着沿着海床的方向的火线上发射管道(1),夹紧装置(5b) 连接到容器(2)并且适于支撑先前发射的管道(1)的重量,并且将附件(10)移动到击发线中到夹紧装置(5b)上方的位置。 然后,在管道(1)由夹紧装置(5b)保持的同时,附件(10)连接到夹紧(5b)装置上方的管道(1),随着附件(10)和推出的管道(1) 连接到其上并可释放地固定到受控负载提升装置(5),并且连接到其上的附件(10)和推出管线(1)的重量从夹紧装置(5b)传送到受控负载提升装置(5) 而附件(10)和与其连接的发射管道(1)保持在点火线中。 最后,夹紧装置(5b)从管道(1)脱离并远离射击线。 然后,连接在其上的附件(10)和发射管线(1)通过受控负载提升装置(5)沿着点火线降低。
    • 6. 发明申请
    • Marine Pipelaying System and Method for Installing an Offshore Pipeline That Includes One or More Accessories
    • 船舶管道系统和安装包含一个或多个附件的海上管道的方法
    • US20080304912A1
    • 2008-12-11
    • US11883850
    • 2005-02-08
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus Wijning
    • Joop RoodenburgAnne Klaas De GrootDiederick Bernardus Wijning
    • F16L1/14
    • F16L1/19F16L1/14F16L1/207F16L1/23
    • Marine pipelaying method and system for installing an offshore pipeline (1) that includes one or more accessories (10). The method includes the steps of providing a vessel (2), launching the pipeline (1) in a firing line from the vessel (2) in the direction of the seabed, engaging the pipeline (1) with a clamping device (5b) that is connected to the vessel (2) and adapted to support the weight of the previously launched pipeline (1), and moving the accessory (10) into the firing line to a position above the clamping device (5b). Then the accessory (10) is connected to the pipeline (1) above the clamping (5b) device while the pipeline (1) is held by the clamping device (5b) Follow that the accessory (10) and the launched pipeline (1) connected thereto and releasably secured to a controlled load hoisting device (5) and the weight of the accessory (10) and the launched pipeline (1) connected thereto are transferred from the clamping device (5b) to the controlled load hoisting device (5) while the accessory (10) and the launched pipeline (1) connected thereto remain in the firing line. Finally the clamping device (5b) is disengaged from the pipeline (1) and moved away from firing line. Then the accessory (10) and the launched pipeline (1) connected thereto are lowered along the firing line by the controlled load hoisting device (5).
    • 用于安装包括一个或多个附件(10)的海上管道(1)的海上管道铺设方法和系统。 该方法包括以下步骤:提供容器(2),在管线(1)上沿着海底方向从容器(2)沿着沿着海床的方向的火线上发射管道(1),夹紧装置(5b) 连接到容器(2)并且适于支撑先前发射的管道(1)的重量,并且将附件(10)移动到击发线中到夹紧装置(5b)上方的位置。 然后,在管道(1)由夹紧装置(5b)保持的同时,附件(10)连接到夹紧(5b)装置上方的管道(1),随着附件(10)和推出的管道(1) 连接到其上并可释放地固定到受控负载提升装置(5),并且连接到其上的附件(10)和推出管线(1)的重量从夹紧装置(5b)传送到受控负载提升装置(5) 而附件(10)和与其连接的发射管道(1)保持在点火线中。 最后,夹紧装置(5b)从管道(1)脱离并远离射击线。 然后,连接在其上的附件(10)和发射管线(1)通过受控负载提升装置(5)沿着点火线降低。
    • 8. 发明授权
    • System for overload protection for pipe or cable laying structures
    • 管道或电缆铺设结构的过载保护系统
    • US07226244B1
    • 2007-06-05
    • US10223191
    • 2002-08-19
    • Anne Klaas De GrootJoop Roodenburg
    • Anne Klaas De GrootJoop Roodenburg
    • F16L1/19F16L1/23F16L1/235
    • F16L1/207F16L1/19F16L1/203F16L1/23F16L1/235
    • The invention is vessel with a tower adapted to be inclined for handling of tubulars mad of a vessel, a tower with a mast that can be inclined, a pipe reel for storing passing tubulars, a strut with a sleeve for engaging and enabling tower inclination, and a tensioner mounted moveably on the mast for receiving the tubular wherein the tensioner is made of two connectors connected to the mast, a frame that engages the connectors, two track bodies that engage the tensioner frame and the tubular, and an adjustable vertical support adapted to modify the relationship between the force transmitted by the adjustable vertical support onto the tensioner and the motion of the tensioner relative to the mast.
    • 本发明是具有适于倾斜用于处理容器管状管的塔架的塔架,具有可倾斜的桅杆的塔架,用于储存通过管件的管式卷轴,具有用于接合和实现塔架倾斜的套筒的支柱, 以及张紧器,其可移动地安装在所述桅杆上以用于接收所述管状物,其中所述张紧器由连接到所述桅杆的两个连接器构成,接合所述连接器的框架,与所述张紧器框架和所述管状物接合的两个轨道体, 以改变由可调节的垂直支撑件传递到张紧器上的力与张紧器相对于桅杆的运动之间的关系。
    • 9. 发明授权
    • Compensation and hoisting apparatus
    • 补偿和起重设备
    • US06926260B1
    • 2005-08-09
    • US10429820
    • 2003-05-05
    • Anne Klaas De GrootJoop RoodenburgRobert Frodo Van Kuilenburg
    • Anne Klaas De GrootJoop RoodenburgRobert Frodo Van Kuilenburg
    • B66D3/04E21B19/00E21B19/09B63B23/02
    • B66D3/046B66D3/043E21B19/008E21B19/09Y10S254/90
    • The invention is a hoisting device for a vessel a base structure provided with fixed cable blocks with pulleys; a trolley connected to a cable pulley block and a mechanism for gripping a load; a compensator a hoisting mechanism with a hoisting cable and a winch, wherein the hoisting cable is guided over the cable pulleys connected to the base structure and is adapted to move the trolley relative to the base structure with the aid of the winch; a secondary compensator with fixed cable blocks and pulleys connected to the base; a cable pulley set connected to the compensator end; a connection cable connected to a stationary section and a movable cable block with pulleys; a hoist connected to the vessel; a connecting cable guided over pulleys; and movable cable block and is adapted to move the compensator second end with the aid of the secondary hoisting mechanism.
    • 本发明是一种用于容器的提升装置,底架具有带滑轮的固定电缆块; 连接到电缆滑轮组的手推车和用于夹紧负载的机构; 补偿器,具有提升电缆和绞盘的提升机构,其中所述提升电缆被引导到连接到所述基座结构的所述电缆滑轮上,并且适于在所述绞盘的帮助下相对于所述基座结构移动所述手推车; 具有连接到基座的固定电缆块和滑轮的辅助补偿器; 连接到补偿器端的电缆滑轮组; 连接到固定部分的连接电缆和带滑轮的可移动电缆块; 与船舶连接的起重机; 连接电缆引导在滑轮上; 和可移动的电缆块,并且适于在辅助提升机构的帮助下移动补偿器的第二端。
    • 10. 发明授权
    • Vessel comprising a subsea equipment motion restraining and guidance system
    • 船舶包括海底设备运动限制和引导系统
    • US08056492B2
    • 2011-11-15
    • US11991140
    • 2005-08-29
    • Joop RoodenburgAnne Klaas De GrootPieter Dirk Melis Van Duivendijk
    • Joop RoodenburgAnne Klaas De GrootPieter Dirk Melis Van Duivendijk
    • B63B27/16
    • E21B19/002B63B23/34B63B27/36
    • A vessel (2) for handling subsea equipment comprising a subsea equipment hoist system including a winch and a hoist cable (3) for lowering and retrieving subsea equipment (5) in a hoist area of the vessel, a subsea equipment motion restraining and guidance system for restraining subsea equipment motion relative to the vessel in the hoist area. The subsea equipment motion restraining and guidance system includes a main trolley (7), an auxiliary trolley (8) and a vertical trolley guide structure (9) mounted on the hull of the vessel that allows for vertical travel of the trolleys and further a top end engagement member (10), which is movably supported by said main trolley and which is adapted to engage on a top end of the subsea equipment, and one or more rail engaging members (3a) mounted on said auxiliary trolley, each adapted to engage on a vertical rail (11) mounted on said subsea equipment as said subsea equipment passes vertically by said auxiliary trolley.
    • 一种用于处理海底设备的船舶(2),包括一个海底设备提升系统,包括一个绞盘和一个用于降低和检索船舶起重区域内的海底设备(5)的起重缆索(3),海底设备运动限制和引导系统 用于限制相对于起重机区域中的船只的海底设备运动。 海底设备运动限制和引导系统包括安装在船体上的主手推车(7),辅助手推车(8)和垂直手推车导向结构(9),其允许手推车的垂直行进,还有一个顶部 端部接合构件(10),其由所述主手推车可移动地支撑并且适于接合在海底设备的顶端;以及一个或多个安装在所述辅助手推车上的导轨接合构件(3a),每个都适于接合 在所述海底设备通过所述辅助手推车垂直地通过时安装在所述海底设备上的竖直轨道(11)上。