    • 1. 发明授权
    • Cluster system, method and device for expanding cluster system
    • 集群系统,扩展集群系统的方法和装置
    • US09465417B2
    • 2016-10-11
    • US13096588
    • 2011-04-28
    • Jianbo ZhuLingqiang FanBing Wang
    • Jianbo ZhuLingqiang FanBing Wang
    • G06F11/20H04L12/26H04L12/775G06F1/18G06F1/26
    • G06F1/189G06F1/26G06F11/2007G06F11/2035H04L43/0811H04L45/58
    • A method for expanding a cluster system is provided. The cluster system includes at least one Cluster Central Chassis (CCC), and a newly-added Cluster Line-card Chassis (CLC) connected with the CCC to form the cluster system. The method includes the following steps. A control plane is established. An equipment management right is switched to the CCC, so that the CCC manages the newly-added CLC. Meanwhile, a cluster line-card device, a cluster central exchange device, and a cluster system are further provided. In implementation, smooth expansion can be achieved without interrupting running equipment services in the CLC current network and without interrupting data services. Moreover, during the expansion process, hardware equipment needs not to be replaced, thus investment of users on the equipment is reduced.
    • 提供了一种用于扩展集群系统的方法。 集群系统包括至少一个集群中心机箱(CCC)和与CCC连接的新增的集群线路卡机箱(CLC),以形成集群系统。 该方法包括以下步骤。 建立一个控制平面。 设备管理权转用CCC,CCC管理新增的CLC。 同时,还提供集群线路卡设备,集群中央交换设备和集群系统。 在实施中,可以实现平滑扩展,而不会中断CLC当前网络中的运行设备服务,而不会中断数据服务。 此外,在扩展过程中,硬件设备不需要更换,用户对设备的投资减少。
    • 2. 发明申请
    • CLUSTER SYSTEM, METHOD AND DEVICE FOR EXPANDING CLUSTER SYSTEM
    • 集群系统,扩展集群系统的方法和装置
    • US20110208844A1
    • 2011-08-25
    • US13096588
    • 2011-04-28
    • Jianbo ZhuLingqiang FanBing Wang
    • Jianbo ZhuLingqiang FanBing Wang
    • G06F15/177
    • G06F1/189G06F1/26G06F11/2007G06F11/2035H04L43/0811H04L45/58
    • A method for expanding a cluster system is provided. The cluster system includes at least one Cluster Central Chassis (CCC), and a newly-added Cluster Line-card Chassis (CLC) connected with the CCC to form the cluster system. The method includes the following steps. A control plane is established. An equipment management right is switched to the CCC, so that the CCC manages the newly-added CLC. Meanwhile, a cluster line-card device, a cluster central exchange device, and a cluster system are further provided. In implementation, smooth expansion can be achieved without interrupting running equipment services in the CLC current network and without interrupting data services. Moreover, during the expansion process, hardware equipment needs not to be replaced, thus investment of users on the equipment is reduced.
    • 提供了一种用于扩展集群系统的方法。 集群系统包括至少一个集群中心机箱(CCC)和与CCC连接的新增的集群线路卡机箱(CLC),以形成集群系统。 该方法包括以下步骤。 建立一个控制平面。 设备管理权转用CCC,CCC管理新增的CLC。 同时,还提供集群线路卡设备,集群中央交换设备和集群系统。 在实施中,可以实现平滑扩展,而不会中断CLC当前网络中的运行设备服务,而不会中断数据服务。 此外,在扩展过程中,硬件设备不需要更换,用户对设备的投资减少。