会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Buried pipeline repair system
    • 埋管道维修系统
    • US09303794B2
    • 2016-04-05
    • US14076695
    • 2013-11-11
    • James Pirtle
    • James Pirtle
    • F16L3/26F16L1/26F16L1/20B66F3/35F16L1/028F16L1/06
    • B66F3/35E02F5/003F16L1/028F16L1/06F16L1/166F16L1/20F16L1/26F16L3/26
    • A damaged portion of a pipeline buried in a trench is gradually lifted from the trench to expose the damaged portion above water and provide easy access to the damaged portion. Inflatable roller bags are placed under the pipeline adjacent the damaged portion; the roller bags are then inflated in a controlled manner using a computer-based control unit. A control manifold is connected to the control unit and each of the roller bags by a separate air conduit allowing controlled bag-inflation and bag-deflation process for each roller bag. Once the pipeline is repaired, the roller bags are deflated, lowering the pipeline back to its original position in the trench.
    • 埋藏在沟槽中的管道的受损部分从沟槽逐渐提升以暴露在水面上方的受损部分,并且易于进入受损部分。 充气辊袋放置在与受损部分相邻的管道下方; 然后使用基于计算机的控制单元以可控的方式对辊袋进行充气。 控制歧管通过单独的空气管道连接到控制单元和每个辊袋,允许对每个辊袋进行可控制的袋充气和袋放气过程。 一旦管道被修理,辊袋就放气,将管道降回到其在沟槽中的原始位置。
    • 8. 发明申请
    • BURIED PIPELINE REPAIR SYSTEM
    • BURIED管道维修系统
    • US20150132064A1
    • 2015-05-14
    • US14076695
    • 2013-11-11
    • James Pirtle
    • James Pirtle
    • F16L3/26F16L1/06F16L1/028
    • B66F3/35E02F5/003F16L1/028F16L1/06F16L1/166F16L1/20F16L1/26F16L3/26
    • A damaged portion of a pipeline buried in a trench is gradually lifted from the trench to expose the damaged portion above water and provide easy access to the damaged portion. Inflatable roller bags are placed under the pipeline adjacent the damaged portion; the roller bags are then inflated in a controlled manner using a computer-based control unit. A control manifold is connected to the control unit and each of the roller bags by a separate air conduit allowing controlled bag-inflation and bag-deflation process for each roller bag. Once the pipeline is repaired, the roller bags are deflated, lowering the pipeline back to its original position in the trench.
    • 埋藏在沟槽中的管道的受损部分从沟槽逐渐提升以暴露在水面上方的受损部分,并且易于进入受损部分。 充气辊袋放置在与受损部分相邻的管道下方; 然后使用基于计算机的控制单元以可控的方式对辊袋进行充气。 控制歧管通过单独的空气管道连接到控制单元和每个辊袋,允许对每个辊袋进行可控制的袋充气和袋放气过程。 一旦管道被修理,辊袋就放气,将管道降回到其在沟槽中的原始位置。