会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Power supply
    • 电源
    • US08736104B2
    • 2014-05-27
    • US13171673
    • 2011-06-29
    • Guan Wang
    • Guan Wang
    • H02J1/10
    • G01R31/2801G01R31/2841H02M7/217Y10T307/391Y10T307/766
    • A power supply includes an alternating current (AC)/direct current (DC) converter, a control unit, and a selection switch. The AC/DC converter is connected to an AC power source to convert an AC voltage into a DC voltage. The control unit includes a controller and a switch. The selection switch is connected to the controller, and connected between the AC converter and the power module of a motherboard to connect the AC converter to either the power module or the controller. When the AC/DC converter is connected to the controller, the controller receives the DC voltage to be started, the controller turns on the switch for a predetermined connection time to make the DC voltage be input to the power module, and then turns off the switch for a predetermined disconnection time to make the DC voltage fail to be input to the power module.
    • 电源包括交流(AC)/直流(DC)转换器,控制单元和选择开关。 AC / DC转换器连接到交流电源,将交流电压转换成直流电压。 控制单元包括控制器和开关。 选择开关连接到控制器,并连接在AC转换器和主板的电源模块之间,将AC转换器连接到电源模块或控制器。 当AC / DC转换器连接到控制器时,控制器接收要启动的直流电压,控制器接通开关预定的连接时间,使直流电压输入到电源模块,然后关闭 切换预定的断开时间,使直流电压不能输入到电源模块。
    • 6. 发明授权
    • Adaptor failure tolerance test device
    • 适配器故障容错测试设备
    • US08446153B2
    • 2013-05-21
    • US13086344
    • 2011-04-13
    • Zheng-Quan PengGuan Wang
    • Zheng-Quan PengGuan Wang
    • G01R31/02
    • H04L43/50
    • An adaptor failure tolerance test device includes a first connection module, a second connection module, a teaming control module, and a connection control module. The first connection module includes eight first interfaces configured for connecting to a plurality of respective adaptors of a network server. The second connection module includes eight second interfaces configured for connecting to a switch. The teaming control module includes eight first switches, each of which is connected to a corresponding first interface. The connection control module includes eight second switches and a control unit. Each of the second switches is interposed between a corresponding first switch and a corresponding second interface. The control unit is configured for detecting which first switches are turned on and turning on the second switches corresponding to the first switches which are turned on for a predetermined time period.
    • 适配器故障容忍测试设备包括第一连接模块,第二连接模块,组合控制模块和连接控制模块。 第一连接模块包括被配置为连接到网络服务器的多个相应适配器的八个第一接口。 第二连接模块包括被配置为连接到开关的八个第二接口。 组合控制模块包括八个第一交换机,每个交换机连接到对应的第一接口。 连接控制模块包括八个第二开关和一个控制单元。 每个第二开关插入相应的第一开关和对应的第二接口之间。 控制单元被配置为检测哪些第一开关被接通并且接通对应于在预定时间段内导通的第一开关的第二开关。