会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Method and system for deciding a wiring route
    • 决定布线路线的方法和系统
    • US07251802B2
    • 2007-07-31
    • US11083960
    • 2005-03-21
    • Ippei HachiyaTetsuo SasakiKatsuyuki ItohHiroyuki Suzuki
    • Ippei HachiyaTetsuo SasakiKatsuyuki ItohHiroyuki Suzuki
    • G06F17/50
    • G06F17/5077
    • A wiring route deciding system, for a wiring board containing a multi-pin part, includes an input unit for receiving wiring board and wire connection information, wiring constraint information and wiring setting information, for example. The system further contains a draw wiring processing unit which decides a wiring route of a draw wiring from a part pin to a part periphery boundary based on wiring information inputted by the input unit, an inter-draw wire wiring processing unit which decides the wiring route taken between end points of the draw wiring decided by the draw wiring processing unit, and an output unit which outputs a wiring route information based on that decided by both the draw wiring processing unit and the inter-draw wire wiring processing unit. There is also provided a method counterpart for a wire routing scheme for a wiring board containing a multi-pin part.
    • 对于包含多针部分的布线板,布线路径决定系统包括例如用于接收布线板的输入单元和布线连接信息,布线约束信息和布线设置信息。 该系统还包括一个拉线布线处理单元,该布线处理单元根据由输入单元输入的布线信息,确定从一个引脚到一部分边界边界的布线的布线路线;布线布线处理单元, 在由拉丝布线处理单元决定的拉丝布线的端点之间取出,以及输出单元,该输出单元基于由拉丝布线处理单元和拉伸布线处理单元决定的布线路线信息。 还提供了一种用于包含多引脚部分的布线板的布线方案的方法。
    • 2. 发明申请
    • Method and system for deciding a wiring route
    • 决定布线路线的方法和系统
    • US20050235243A1
    • 2005-10-20
    • US11083960
    • 2005-03-21
    • Ippei HachiyaTetsuo SasakiKatsuyuki ItohHiroyuki Suzuki
    • Ippei HachiyaTetsuo SasakiKatsuyuki ItohHiroyuki Suzuki
    • G06F17/50H03K17/693H05K3/00
    • G06F17/5077
    • By deciding a draw wiring route from a part to eliminate an intersection of wire connections generated by the part direction and the terminal arrangement order, it is possible to reduce the wiring layer used and increase the mounting density. Draw wiring processing from terminals of parts is performed prior to the entire wiring processing. In order to optimally perform the draw wiring processing, the parts connected to an object to be wired are moved onto a virtual wiring board and wiring processing is performed there. When moving a part from the real wiring board, an area around the part is cut out from the real wiring board and moved onto the virtual wiring board. On the virtual wiring board, the part direction is rotated and parallel-displaced to arrange it in the optimal state for the wiring to decide the draw wiring direction and perform wiring between the respective terminals.
    • 通过决定从零件的布线路线消除由部分方向和端子布置顺序产生的线连接,可以减少所使用的布线层并增加安装密度。 在整个接线处理之前进行从零件端子的接线处理。 为了最佳地执行拉制布线处理,连接到待布线对象的部件移动到虚拟布线板上,并且在那里执行布线处理。 当从真正的布线板移动零件时,将零件周围的区域从真正的布线板切出并移动到虚拟布线板上。 在虚拟布线板上,部件方向旋转并且平行移位,以使布线成为布线的最佳状态,以决定拉丝方向并执行各端子之间的布线。