会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • VOLTAGE ADJUSTMENT DEVICE FOR POWER DISTRIBUTION SYSTEM, VOLTAGE ADJUSTING METHOD, AND POWER CONTROL SYSTEM
    • 用于配电系统的电压调节装置,电压调节方法和功率控制系统
    • US20150286227A1
    • 2015-10-08
    • US14418236
    • 2013-07-24
    • Hitachi, Ltd.Tohoku Electric Power Co., Inc.Tohoku Electric Manufacturing Co., Ltd.
    • Masahiro WatanabeRyo EgashiraKenichiro YamaneKatsuhiro MatsudaTakafumi FutakamiToshiyuki SetoJun Murakoshi
    • G05F1/14
    • G05F1/14H02J3/1878Y02E40/12Y02E40/30
    • A voltage adjustment device, a voltage adjusting method and a power control system for a distribution system are provided, in which the voltage adjustment device and a static var compensator are appropriately operated in a coordinated manner and the sustention of voltage and the enhancement of the operation efficiency are attained. A voltage adjustment device for a distribution system is installed in the distribution system including a static var compensator on an end side and controls a secondary voltage to be within a predetermined limit value by adjusting a tap position. The voltage adjustment device includes a first unit configured to estimate the secondary voltage; a second unit configured to obtain a corrected voltage by correcting the estimated secondary voltage by using a correction amount obtained from an output of the static var compensator; and a third unit configured to compare the corrected voltage with the predetermined limit value and operate the tap position when the corrected voltage deviates from the predetermined limit value.
    • 提供一种用于配电系统的电压调节装置,电压调节方法和功率控制系统,其中电压调节装置和静态无功补偿器以协调的方式适当地运行并且电压的维持和操作的增强 效率达到。 用于分配系统的电压调节装置安装在分配系统中,包括端侧的静态无功补偿器,并通过调节分接头位置来控制次级电压在预定极限值内。 电压调节装置包括:第一单元,被配置为估计次级电压; 第二单元,被配置为通过使用从静态无功补偿器的输出获得的校正量来校正所估计的次级电压来获得校正电压; 以及第三单元,其被配置为将所述校正电压与所述预定极限值进行比较,并且当所述校正电压偏离所述预定极限值时,操作所述分接头位置。
    • 6. 发明申请
    • METHOD FOR DETECTING OPEN-CIRCUIT FAULTS IN ELECTRIC POWER DISTRIBUTION SYSTEM, AND POWER DISTRIBUTION FACILITIES MANAGEMENT SYSTEM
    • 检测电力分配系统中的开路故障的方法和功率分配设备管理系统
    • US20150212138A1
    • 2015-07-30
    • US14419482
    • 2013-07-22
    • Hitachi, Ltd.
    • Kazutoshi TsuchiyaKenichiro YamaneMasahiro AdachiMitsugu Daino
    • G01R31/02H02J13/00G01R21/133
    • G01R31/02G01R21/133G01R31/08G01R31/085H02J13/00
    • An open-circuit fault in an electric power distribution line is detected using metering devices each having a communication function and each placed on a power consumer's circuit connected to an electric power distribution system, and a location of the open circuit is identified. An electric power distribution facilities management system obtains, from the power distribution system to which are connected consumers each including a sensor provided with a communication function, meter-reading data within each of the sensors having a communication function, via a communication system. The system includes a number-of-unavailable-data calculation unit that calculates a number of unavailable meter-reading data from the sensors having a communication function, an on-fault number-of-unavailable-data calculation unit that calculates the number of sensors each having a communication function and each placed in the power distribution system, and a fault determining unit that determines whether an open-circuit fault is occurring in the power distribution system.
    • 使用各自具有通信功能的计量装置来检测配电线路中的开路故障,并且每个放置在连接到配电系统的电力用户的电路上,并且识别开路的位置。 电力配送设备管理系统经由通信系统从具有通信功能的传感器的连接消费者的配电系统获得具有通信功能的每个传感器内的读表数据。 该系统包括一个不可用数据计算单元,其计算来自具有通信功能的传感器的不可用的读表数据的数量,故障数不可数数据计算单元,其计算传感器的数量 每个具有通信功能并且各自放置在配电系统中,以及故障确定单元,其确定在配电系统中是否发生开路故障。
    • 10. 发明授权
    • Power system stabilization system and method
    • US10860000B2
    • 2020-12-08
    • US15566461
    • 2015-04-24
    • Hitachi, Ltd.
    • Shota OmiMasatoshi KumagaiKenichiro Yamane
    • G05B19/4093H02J3/24G05B19/418G05F1/66H02J3/18H02P9/10H02J3/38
    • It is possible by means of a system simulation device to extract a disturbance mode wherein multiple accident conditions are assumed and to determine control parameters, but when the number of accident conditions increases, a threshold value pertaining to a divergence constant deviates prior to an update period, with the result that an uncontrollable disturbance mode appears. In order to solve this problem, the present invention is a power system stabilization system for determining control parameters for a control device connected to a power system, the power system stabilization system equipped with: a disturbance mode prediction unit for predicting a disturbance mode of a power system on the basis of operation information and an assumed system configuration for the power system; a post-control parameter update period prediction unit for predicting an update period for a post-control parameter in post-control after a disturbance has occurred; a threshold value setting unit for setting a threshold value pertaining to a divergence constant on the basis of the disturbance mode and the update period for the post-control parameter; and a control parameter determination unit for determining a control parameter of the control device on the basis of the disturbance mode and the threshold value.