会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Computer system for managing part order placement
    • 用于管理零件订单放置的计算机系统
    • US08521622B2
    • 2013-08-27
    • US12597582
    • 2008-05-28
    • Hidenobu TanakaKazuma KunoSatoshi MiwaKenji Shirae
    • Hidenobu TanakaKazuma KunoSatoshi MiwaKenji Shirae
    • G06F17/50G06Q10/08
    • G06Q10/087G05B19/41865G05B2219/32035G06Q10/06G06Q10/0875Y02P90/20
    • A computer program is embodied on a non-transitory computer readable medium. The computer program manages order of parts according to a production plan. The computer program, when run on a computer, controls the computer to execute functions comprising developing a plurality of parts necessary to produce a product which comprises at least one of a first product model and a second product model, and required volume of each of the parts according to the product model. The program also controls the computer to compare parts which were developed and required volume of the parts for the first product model with the parts which were developed and required volume of the parts for the second product model. A difference is calculated between volume of the parts necessary for production of the first product model and volume of the parts necessary to produce the second product model concerning each of the parts for the first and the second product models according to an input of a production change from the first product model for which parts have been ordered to the second product model. The program then controls the computer to display the parts and volume of the parts necessary to produce the second product model in association with the difference on a display screen.
    • 计算机程序体现在非暂时的计算机可读介质上。 计算机程序根据生产计划管理零件的顺序。 计算机程序在计算机上运行时控制计算机执行功能,包括开发产生产品所需的多个部件,该产品包括第一产品模型和第二产品模型中的至少一个,并且每个 部件根据产品型号。 该程序还控制计算机将第一个产品型号的部件的开发部分和所需部件的数量与所开发的零件和第二个产品型号的零件所需的体积进行比较。 根据生产变更的输入,计算生产第一产品型号所需零件的体积和产生第一产品模型和第二产品模型的每个零件的第二产品模型所需零件量的差异 从第一个产品型号,订购了第二个产品型号。 该程序然后控制计算机显示与显示屏幕上的差异相关联的产生第二产品模型所需的部件的部件和体积。
    • 2. 发明申请
    • COMPUTER SYSTEM FOR MANAGING PART ORDER PLACEMENT
    • 用于管理零件订购的计算机系统
    • US20100121742A1
    • 2010-05-13
    • US12597582
    • 2008-05-28
    • Hidenobu TanakaKazuma KunoSatoshi MiwaKenji Shirae
    • Hidenobu TanakaKazuma KunoSatoshi MiwaKenji Shirae
    • G06Q10/00
    • G06Q10/087G05B19/41865G05B2219/32035G06Q10/06G06Q10/0875Y02P90/20
    • If a product to be produced is modified, a computer system for assisting quick specification of a part necessary for the new production and its quantity and placement of the order of the part on condition that parts unrelated to the modification are used as they are. The computer system for managing part order placement based on a production plan realizes a function of developing parts needed for the production of the type of a product and the quantities of parts according to the type, comparing the parts and their quantities for first and second types when production change from the fist type the parts of which are ordered to the second type is inputted, and calculating the difference between the quantities needed for the production of the second type and those of the first type, and a function of displaying the parts needed for the production of the second type and their quantities in association with the difference on a display screen.
    • 如果要生产的产品被修改,则以原样的方式使用用于辅助快速规范新生产所需部件的计算机系统及其部件的数量和位置,条件是与修改无关的部分。 用于基于生产计划管理零件订单的计算机系统实现了根据类型开发生产产品类型和零件数量所需的零件的功能,比较了第一类和第二类的零件和数量 当输入从第一类型的第一类型的第一类型的生产改变到第二类型的生产时,并且计算生产第二类型和第一类的量之间的差异,以及显示所需部件的功能 用于生产与显示屏幕上的差异相关的第二类型及其数量。