会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Hydraulic flow restriction tube time delay system and method
    • 液压限流管延时系统及方法
    • US09273535B1
    • 2016-03-01
    • US14685176
    • 2015-04-13
    • GEODynamics, Inc.
    • Kevin R. GeorgePhilip Martin SniderJohn T. HardestyMichael D. WroblickyJames A. RollinsNathan G. ClarkJarrod Henry PearsonDavid S. Wesson
    • E21B34/10E21B34/08
    • E21B34/108
    • A hydraulic time delay system and method in a wellbore tool is disclosed. The system/method includes an actuation mechanism which allows pressure to act on a functional piston in the wellbore tool. The movement of the piston is restrained by a partially or filled reservoir which is allowed to exhaust through a flow restriction element. The restriction element comprises standard metal tubing with a known inner diameter and is cut to an exact length as predicted by fluid dynamic modeling. A time delay and rate of piston movement desired for the downhole tool, between a trigger event such as pressure and a functional event, can be tuned with parameters that include the length and diameter of the tubing, reservoir fluid viscosity and number of tubes in parallel. In another embodiment, a secondary plugging element added to the reservoir controls the rate of piston movement and time delay.
    • 公开了一种井筒工具中的液压时间延迟系统和方法。 该系统/方法包括致动机构,其允许压力作用在井筒工具中的功能活塞上。 活塞的运动被允许通过流动限制元件排出的部分或填充的储存器约束。 限制元件包括具有已知内径的标准金属管道,并且通过流体动力学模型预测被切割成精确的长度。 可以利用包括管道的长度和直径,储存器流体粘度和并联的管道数量的参数来调整井下工具所需的时间延迟和活塞运动速率,诸如压力和功能事件之间的触发事件 。 在另一个实施例中,添加到储存器中的次级堵塞元件控制活塞移动速率和时间延迟。
    • 9. 发明授权
    • Wellbore plug isolation system and method
    • 井筒插塞隔离系统及方法
    • US09062543B1
    • 2015-06-23
    • US14459042
    • 2014-08-13
    • GEODynamics, Inc.
    • Philip Martin SniderKevin R. GeorgeJohn T. HardestyMichael D. WroblickyNathan G. ClarkJames A. RollinsDavid S. Wesson
    • E21B43/26E21B43/25
    • E21B33/124E21B23/06E21B31/002E21B33/12E21B33/1204E21B43/116E21B43/14E21B43/26
    • A wellbore plug isolation system and method for positioning plugs to isolate fracture zones in a horizontal, vertical, or deviated wellbore is disclosed. The system/method includes a wellbore casing laterally drilled into a hydrocarbon formation, a wellbore setting tool (WST) that sets a large inner diameter (ID) restriction sleeve member (RSM), and a restriction plug element (RPE). The WST is positioned along with the RSM at a desired wellbore location. After the WST sets and seals the RSM, a conforming seating surface (CSS) is formed in the RSM. The CSS is shaped to engage/receive RPE deployed into the wellbore casing. The engaged/seated RPE isolates heel ward and toe ward fluid communication of the RSM to create a fracture zone. The RPE's are removed or left behind prior to initiating well production without the need for a milling procedure. A large ID RSM diminishes flow constriction during oil production.
    • 公开了一种用于定位插塞以隔离水平,垂直或偏离井筒中的断裂带的井筒塞隔离系统和方法。 系统/方法包括横向钻入烃地层的井眼套管,设置大内径(ID)限制套筒构件(RSM)的井筒设定工具(WST)和限制塞块元件(RPE))。 WST与RSM一起定位在所需的井眼位置。 在WST设置和密封RSM之后,在RSM中形成一个符合要求的座面(CSS)。 CSS被设计成接合/接收部署到井筒套管中的RPE。 接合/就座的RPE隔离了RSM的脚跟区和脚趾病房流体通信,以创建骨折区。 在开始生产之前,RPE被移除或留下,而不需要铣削程序。 大量的RSM减少了石油生产过程中的流量收缩。