会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • CAPACITY PLANNING MANAGEMENT
    • 能力规划管理
    • US20140019186A1
    • 2014-01-16
    • US13545704
    • 2012-07-10
    • Wen-Syan LiGufei SunHeng Wang
    • Wen-Syan LiGufei SunHeng Wang
    • G06Q10/06
    • G06Q10/0631
    • In accordance with aspects of the disclosure, systems and methods are provided for capacity planning management by generating a capacity expansion plan for a plurality of production resources used to produce one or more products relative to one or more time intervals. The systems and methods may include evaluating production patterns for each production resource to determine a production capacity within each time interval, evaluating budget patterns for each production resource to determine a production cash flow within each time interval, generating one or more potential capacity expansion forecasting schemes for each production resource and production budget based on the production patterns for each production resource and the budget patterns for each production budget, and generating the capacity expansion plan within each time interval based on the one or more potential capacity expansion forecasting schemes for each production resource and production budget.
    • 根据本公开的方面,通过为用于生产一个或多个产品相对于一个或多个时间间隔的多个生产资源生成容量扩展计划,为容量规划管理提供了系统和方法。 系统和方法可以包括评估每个生产资源的生产模式以在每个时间间隔内确定生产能力,评估每个生产资源的预算模式以确定每个时间间隔内的生产现金流,生成一个或多个潜在的容量扩展预测方案 根据每个生产资源的生产模式和每个生产预算的预算模式对每个生产资源和生产预算进行生产,并根据每个生产资源的一个或多个潜在产能扩张预测方案,在每个时间间隔内生成能力扩张计划 和生产预算。
    • 8. 发明申请
    • DEMAND-DRIVEN COLLABORATIVE SCHEDULING FOR JUST-IN-TIME MANUFACTURING
    • 需求驱动的时间制造协调调度
    • US20130066455A1
    • 2013-03-14
    • US13229199
    • 2011-09-09
    • Wen-Syan LiHeng WangGufei Sun
    • Wen-Syan LiHeng WangGufei Sun
    • G06F19/00G06N3/12
    • G06Q10/087
    • A schedule manager may include a chromosome comparator configured to compare a plurality of schedule chromosomes, each schedule chromosome including a potential schedule of use of manufacturing resources within one or more time intervals in producing one or more items, and configured to compare each of the plurality of schedule chromosomes relative to constraints, to thereby output a selected subset of the plurality of schedule chromosomes. The schedule manager may include a chromosome combiner configured to combine schedule chromosomes of the selected subset to obtain a next generation of schedule chromosomes for output to the chromosome comparator and for subsequent comparison therewith of the next generation of schedule chromosomes with respect to the constraints, as part of an evolutionary loop of the plurality of schedule chromosomes between the chromosome comparator and the chromosome combiner, and a scheduler configured to select a selected schedule chromosome therefrom.
    • 调度管理器可以包括被配置为比较多个调度染色体的染色体比较器,每个调度染色体包括在生成一个或多个项目的一个或多个时间间隔内使用制造资源的潜在时间表,并且被配置为比较多个 相对于约束调度染色体,从而输出多个调度染色体的选定子集。 调度管理器可以包括染色体组合器,其被配置为组合所选子集的调度染色体以获得用于输出到染色体比较器的下一代调度染色体,并且用于随后与下一代相关的约束进行比较,作为 在染色体比较器和染色体组合器之间的多个调度染色体的进化环的一部分,以及被配置为从其选择所选择的调度染色体的调度器。