会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • Hardware CPU utilization meter for a microprocessor
    • 微处理器硬件CPU利用率表
    • US20050071688A1
    • 2005-03-31
    • US10671251
    • 2003-09-25
    • David HepnerAndrew Walls
    • David HepnerAndrew Walls
    • G06F1/32G06F11/34G06F1/26
    • G06F11/3466G06F1/3228Y02D10/34
    • A hardware based solution to CPU utilization and power management that avoids an additional set of software tasks to monitor CPU utilization. The system has a CPU, a counter; a monitor, and a clock. The clock provides a CLK signal to the counter when a software task is running on the CPU, and the counter counts the number of clock pulses since a RESET. The monitor samples and holds the value of the counter at the last RESET. The counter outputs a signal to the monitor that is responsive to the count content at the time of the last reset. The monitor outputs this value as a control signal. This control signal may be a power control signal, a function control signal, or even a clock control signal, responsive to count content. For example, the counter may output a control signal reducing power input or clock pulse input to the CPU responsive to monitor value when the CPU utilization is below a threshold.
    • 基于硬件的CPU利用率和电源管理解决方案,避免了一组额外的软件任务来监控CPU利用率。 系统有一个CPU,一个柜台; 一个监视器和一个时钟。 当CPU上运行软件任务时,该时钟向计数器提供CLK信号,并且计数器对复位后的时钟脉冲数进行计数。 显示器在上次复位时采样并保持计数器的值。 计数器在上一次复位时响应于计数内容向监视器输出信号。 监视器将该值作为控制信号输出。 该控制信号可以是响应于计数内容的功率控制信号,功能控制信号或甚至时钟控制信号。 例如,当CPU利用率低于阈值时,计数器可以响应于监视值,输出将功率输入或时钟脉冲输入减少到CPU的控制信号。
    • 3. 发明申请
    • Predictive failure analysis and failure isolation using current sensing
    • 使用电流检测的预测故障分析和故障隔离
    • US20050043925A1
    • 2005-02-24
    • US10643253
    • 2003-08-19
    • David HepnerAndrew Walls
    • David HepnerAndrew Walls
    • G01R21/00G06F11/24
    • G06F11/24
    • A method, system, and computer program for predicting the failure of an electronic circuit. One embodiment of the invention monitors the current utilization, environment conditions, and operating conditions of the electronic circuit. A system manager is altered if the current utilization of the electronic circuit is outside a pass range at the measured environmental conditions and the measured operating conditions of the electronic circuit. The invention may also be configured such that if the electronic circuit fails, the electronic circuit is isolated from among a plurality of potentially failed electronic circuits using the measured current utilization, environment conditions, and operating conditions of the electronic circuit.
    • 一种用于预测电子电路故障的方法,系统和计算机程序。 本发明的一个实施例监测电子电路的当前利用率,环境条件和操作条件。 如果电子电路的当前利用率在测量的环境条件和电子电路的测量操作条件下超出通过范围,则系统管理器被改变。 本发明还可以被配置为使得如果电子电路发生故障,则电子电路使用测量的电流利用率,环境条件和电子电路的操作条件与多个潜在故障的电子电路隔离。
    • 5. 发明申请
    • Computer-component power-consumption monitoring and control
    • 计算机组件功耗监测与控制
    • US20050102539A1
    • 2005-05-12
    • US10702410
    • 2003-11-06
    • David HepnerAndrew Walls
    • David HepnerAndrew Walls
    • G06F1/20G06F1/32G06F11/30G06F1/26
    • G06F11/3031G06F1/206G06F1/3203G06F1/324G06F1/3287G06F11/3062Y02D10/126Y02D10/16Y02D10/171
    • An apparatus for regulating power allocated to components within a computer system includes a sensor to sense power drawn by a first device within a computer system, the first device having device resources needed to satisfy functional demand required of the first device. A second sensor is provided to sense power drawn by a second device within the computer system, the second device having device resources needed to satisfy functional demand required of the second device. A power-monitoring module is provided to monitor the power drawn and the functional demand required of the first and second devices. A system control module, operably connected to the power-monitoring modules, is provided to regulate power allocated to the first and second devices by optimizing use of the device resources in accordance with the temperature, power drawn, and respective functional demands of the devices.
    • 用于调节分配给计算机系统内的组件的功率的装置包括传感器,用于感测由计算机系统内的第一设备提取的功率,第一设备具有满足第一设备所需的功能需求所需的设备资源。 提供第二传感器以感测由计算机系统内的第二设备提取的电力,第二设备具有满足第二设备所需的功能需求所需的设备资源。 提供功率监测模块来监测第一和第二设备所需的功率和功能需求。 提供可操作地连接到功率监控模块的系统控制模块,用于通过根据设备的温度,功率消耗和相应的功能需求优化设备资源的使用来调节分配给第一和第二设备的功率。