会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Process and installation for drying and heating coal
    • 干燥加热煤的加工和安装
    • US4178150A
    • 1979-12-11
    • US863795
    • 1977-12-23
    • Claus FlockenhausHorst FachGunter GabrielManfred GalowJoachim Meckel
    • Claus FlockenhausHorst FachGunter GabrielManfred GalowJoachim Meckel
    • C10B57/10C10B57/08C10F5/00C10L9/08F26B17/10F27B15/00
    • C10B57/08
    • Coal is passed in a two-stage process through a drying and heating zone. The coal coming from the drying zone is separated from the heat carrier gas which is then passed into the atmosphere after going through an electrodust separator. The dried coal is delivered into the heating zone. The hot gas for the heating zone is furnished by a combustion device. The exhaust gas from the heating zone is separated from the heated coal which is recovered while the exhaust gas is passed back into the drying zone. Part of the hot combustion gas coming from the combustion chamber is branched off and passed into the exhaust gas coming out of the drying zone either directly behind the drying zone or behind the separator for separating the dried coal from the exhaust gas. The temperature of the exhaust gas from the drying zone is thus prevented from sinking below the sulfuric acid dewpoint or water vapor dewpoint which might result in corrosive damage to the apparatus, particularly to the electrodust separator.
    • 煤通过干燥和加热区在两阶段过程中通过。 来自干燥区的煤与热载体分离,然后通过电极分离器后将其通入大气中。 干燥的煤被输送到加热区。 加热区的热气由燃烧装置提供。 来自加热区域的废气与废气再次返回到干燥区域中被回收的加热煤分离。 来自燃烧室的热燃烧气体的一部分被分支并且从干燥区域直接排出干燥区域的废气或分离器之后的废气中,从而将干燥的煤与废气分离。 因此,防止来自干燥区域的废气的温度低于硫酸露点或水蒸气露点,这可能导致对设备,特别是电极分离器的腐蚀性损坏。
    • 4. 发明授权
    • Process and apparatus for preheating coal intended for use in coking
installations
    • 预计用于焦化设备的煤的工艺和设备
    • US4202733A
    • 1980-05-13
    • US959186
    • 1978-11-07
    • Willy LukeGunter Gabriel
    • Willy LukeGunter Gabriel
    • C10B57/10C10B57/08F23K1/04C10B29/00C10B31/00C10B45/00
    • C10B57/08
    • Coal is preheated prior to passing it into a coking installation by feeding measured amounts of the relatively wet coal into and through one or more circulation dryers heated to an elevated temperature and collecting the hot coal in a collecting bin and automatically measuring the level of the hot coal in said bin and automatically adjusting the amount of coal fed into said dryer depending on the level of coal measured in said collecting bin. Means are provided for preventing further adjustment of the coal feed rate should the exhaust gas temperature of a dryer fall outside the limits of a preselected preset temperature range and to bring the process back under level-actuated feed rate control once the exhaust gas temperature moves back within the preset range.
    • 在通过将测量的相对湿的煤进入并通过加热到高温的一个或多个循环干燥器中并将热煤收集在收集箱中并自动测量热量的水平之后,将煤预先通入焦化装置 在所述垃圾箱内的煤,并且根据在所述收集箱中测量的煤的水平自动调节供给到所述干燥器中的煤的量。 提供了如果干燥机的废气温度落在预设的预设温度范围的限度以下并且一旦废气温度回升就使处理返回到液位致动进给速率控制之下的方式来防止进一步调节供煤速率 在预设范围内。